feat!: ulxly integration with agglayer bridge service #2083
Triggered via pull request
September 29, 2025 20:05
Status
Cancelled
Total duration
2m 13s
Artifacts
–
ci.yml
on: pull_request
Lint
2m 7s
typos
8s
Check gen-doc generated files
1m 58s
Check gen-proto generated files
41s
Check gen-go-bindings generated files
2m 6s
Check gen-load-test-modes generated files
59s
Check gen-json-rpc-types generated files
1m 52s
Test
2m 4s
Install go package
31s
Matrix: Run loadtest
Annotations
14 errors and 1 warning
|
Check gen-json-rpc-types generated files
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Check gen-doc generated files
The operation was canceled.
|
|
Check gen-doc generated files
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Test
The operation was canceled.
|
|
Test
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Check gen-go-bindings generated files
The operation was canceled.
|
|
Check gen-go-bindings generated files
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Run loadtest (anvil)
The operation was canceled.
|
|
Run loadtest (anvil)
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Run loadtest (geth)
The operation was canceled.
|
|
Run loadtest (geth)
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
ci
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Lint
The operation was canceled.
|
|
Lint
Canceling since a higher priority waiting request for ci-refs/pull/697/merge exists
|
|
Check gen-go-bindings generated files
The process '/usr/bin/git' failed with exit code 128
|