Sprint 2 Stories — stock_alert_notif

Sprint Goal: Incorporate the workflow object to show progression of a submission through the 3 steps, incorporate database and get working end-to-end.

Team: Richmond & Giorgi
Sprint Duration: [Start Date] - [End Date]


User Stories

Story 1: Workflow State Tracking

As a system administrator
I want alerts to progress through clearly defined workflow states (Created → Active → Triggered)
So that I can track the lifecycle and status of each alert in the system

Acceptance Criteria:

  • WorkflowState class created with states: CREATED, ACTIVE, TRIGGERED, CANCELLED
  • Each alert has an associated workflow state that persists to the database
  • Workflow transitions are validated (e.g., cannot skip from CREATED to TRIGGERED)
  • UI/reports can display which step (1/3, 2/3, 3/3) an alert is in
  • Unit tests verify valid and invalid workflow transitions

Owner: Richmond
Estimate: 3 days
Status: Completed


Story 2: Complete Database Integration

As a developer
I want all entities (Users, Alerts, Notifications, WorkflowStates) to persist to a relational database
So that data survives application restarts and can be queried efficiently

Acceptance Criteria:

  • Database schema includes tables: users, alerts, notifications, workflow_states
  • Foreign key relationships established between tables
  • DAO implementations (JDBC) completed for all entities
  • Integration tests use H2 in-memory database
  • Schema creation script works for both test and production environments

Owner: Giorgi
Estimate: 5 days
Status: Completed


Story 3: User Management Persistence

As a user
I want my account information to be saved in the database
So that I can log in and my alerts persist between sessions

Acceptance Criteria:

  • UserDao interface defines CRUD operations
  • UserDaoImpl implements JDBC persistence
  • Users table created with fields: user_id, username, password_hash, email, phone_number
  • Username uniqueness enforced at database level
  • Unit tests verify user creation, retrieval, and updates

Owner: Giorgi
Estimate: 2 days
Status: Completed


Story 4: AlertManager Scheduled Monitoring

As a system
I want the AlertManager to periodically check alerts on a schedule
So that price conditions are monitored continuously without blocking

Acceptance Criteria:

  • AlertManager uses ScheduledExecutorService instead of infinite loop
  • Check interval is configurable (default: 60 seconds)
  • Scheduler can be started and stopped gracefully
  • Tests verify scheduler behavior and alert checking logic
  • In-progress checks complete before shutdown

Owner: Giorgi
Estimate: 3 days
Status: Completed (Already implemented in Sprint 1)


Story 5: End-to-End Integration Testing

As a QA engineer
I want comprehensive integration tests covering the complete workflow
So that I can verify the system works end-to-end from alert creation to notification

Acceptance Criteria:

  • Test creates user, saves to DB, retrieves successfully
  • Test creates alert, transitions through workflow states
  • Test triggers alert condition, verifies notification created
  • Test verifies workflow state persisted at each step
  • All tests use in-memory H2 database and pass consistently

Owner: Richmond
Estimate: 4 days
Status: Completed


Story 6: Email Integration Placeholder

As a developer
I want clear documentation of where email/SMS sending would be implemented
So that future sprints can easily add real notification delivery

Acceptance Criteria:

  • NotificationService.sendNotification() contains detailed comments
  • Comments show example code for JavaMail API (email)
  • Comments show example code for Twilio API (SMS)
  • Comments show example code for Firebase Cloud Messaging (push)
  • Current implementation simulates successful delivery for demo purposes

Owner: Both
Estimate: 1 day
Status: Completed


Story 7: Update Technical Documentation

As a team member
I want updated class and component diagrams
So that new developers can understand the architecture including database integration

Acceptance Criteria:

  • Class diagram updated to show WorkflowState, all DAOs, and relationships
  • Component diagram shows database layer and DAO interactions
  • Diagrams exported to PNG/PDF and added to repository
  • README updated with links to new diagrams

Owner: Richmond
Estimate: 2 days
Status: In Progress


Story 8: Sprint 2 Scrum Documentation

As a project stakeholder
I want complete Scrum artifacts for Sprint 2
So that I can track progress and understand what was accomplished

Acceptance Criteria:

  • SPRINT2_STORIES.md created with all user stories
  • Coordination meeting notes documented (dates, attendees, discussions)
  • Sprint Review video recorded showing working end-to-end demo
  • SPRINT2_RETROSPECTIVE.md completed with what went well/didn't go well
  • Updated SPRINT2_BOARD.md with final task statuses

Owner: Both
Estimate: 2 days (ongoing throughout sprint)
Status: 🔄 In Progress


Sprint Metrics

  • Total Story Points Planned: 22
  • Total Story Points Completed: 18
  • Velocity: TBD (end of sprint)
  • Number of User Stories: 8
  • Completion Rate: TBD

Definition of Done

For a user story to be considered "Done" in Sprint 2:

  1. ✅ Code implemented and follows coding standards
  2. ✅ Unit tests written and passing (>80% coverage for new code)
  3. ✅ Integration tests passing
  4. ✅ Code reviewed by at least one team member
  5. ✅ Documentation updated (JavaDoc, README, diagrams)
  6. ✅ No critical bugs or compilation errors
  7. ✅ Merged to main branch
  8. ✅ Demonstrated in Sprint Review

Technical Notes

Database Schema

  • Using H2 in-memory database for development/testing
  • Production can use PostgreSQL/MySQL with same schema
  • All timestamps use TIMESTAMP type
  • Primary keys are VARCHAR(100) for UUIDs

Integration Points

  • AlertManager ↔ AlertDAO (persistence)
  • AlertManager ↔ MarketDataAPI (price checking)
  • AlertManager ↔ NotificationService (send alerts)
  • NotificationService ↔ NotificationDao (log delivery attempts)
  • All components ↔ WorkflowStateDAO (track progression)

Last Updated: [Date]