Skip to content

Tests

Tests #522

Triggered via schedule May 18, 2025 01:54
Status Failure
Total duration 34s
Artifacts

tests.yml

on: schedule
Matrix: integration
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test (ubuntu-latest, 18, latest)
Process completed with exit code 1.
integration (ubuntu-latest, latest)
Process completed with exit code 1.
test (ubuntu-latest, 16, 8)
The strategy configuration was canceled because "test.ubuntu-latest_18_latest" failed
test (ubuntu-latest, 20, latest)
Process completed with exit code 1.
test (ubuntu-latest, 20, latest)
The strategy configuration was canceled because "test.ubuntu-latest_18_latest" failed
test (ubuntu-latest, 20, 4.7)
The operation was canceled.
test (ubuntu-latest, 20, 4.7)
The strategy configuration was canceled because "test.ubuntu-latest_18_latest" failed
integration (windows-latest, latest)
The operation was canceled.
integration (windows-latest, latest)
The strategy configuration was canceled because "integration.ubuntu-latest_latest" failed
test (windows-latest, 20, latest)
The operation was canceled.
test (windows-latest, 20, latest)
The strategy configuration was canceled because "test.ubuntu-latest_18_latest" failed
test (ubuntu-latest, 20, next)
The operation was canceled.
test (ubuntu-latest, 20, next)
The strategy configuration was canceled because "test.ubuntu-latest_18_latest" failed
integration (ubuntu-latest, next)
The operation was canceled.
integration (ubuntu-latest, next)
The strategy configuration was canceled because "integration.ubuntu-latest_latest" failed