Skip to content

Tests

Tests #558

Triggered via schedule December 14, 2025 02:01
Status Failure
Total duration 33s
Artifacts

tests.yml

on: schedule
Matrix: integration
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

17 errors
integration (ubuntu-latest, next)
Process completed with exit code 1.
test (ubuntu-latest, 24, next)
Process completed with exit code 1.
test (ubuntu-latest, 16, 8)
The strategy configuration was canceled because "test.ubuntu-latest_24_next" failed
integration (ubuntu-latest, 4.7)
The strategy configuration was canceled because "integration.ubuntu-latest_next" failed
integration (ubuntu-latest, 4.7)
The operation was canceled.
test (ubuntu-latest, 22, latest)
The strategy configuration was canceled because "test.ubuntu-latest_24_next" failed
test (ubuntu-latest, 22, latest)
The operation was canceled.
test (ubuntu-latest, 24, 5.0)
The strategy configuration was canceled because "test.ubuntu-latest_24_next" failed
test (ubuntu-latest, 24, 5.0)
The operation was canceled.
integration (windows-latest, latest)
The strategy configuration was canceled because "integration.ubuntu-latest_next" failed
integration (windows-latest, latest)
The operation was canceled.
integration (ubuntu-latest, latest)
The strategy configuration was canceled because "integration.ubuntu-latest_next" failed
integration (ubuntu-latest, latest)
The operation was canceled.
test (ubuntu-latest, 24, 4.7)
The strategy configuration was canceled because "test.ubuntu-latest_24_next" failed
test (ubuntu-latest, 24, 4.7)
The operation was canceled.
test (windows-latest, 24, latest)
The strategy configuration was canceled because "test.ubuntu-latest_24_next" failed
test (windows-latest, 24, latest)
The operation was canceled.