Skip to content

Merge pull request #53 from BruinGrowly/claude/fix-ci-and-readme-011C… #184

Merge pull request #53 from BruinGrowly/claude/fix-ci-and-readme-011C…

Merge pull request #53 from BruinGrowly/claude/fix-ci-and-readme-011C… #184

Triggered via push November 5, 2025 07:39
Status Failure
Total duration 25s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (3.9)
Process completed with exit code 1.
build (3.12)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_12" failed
build (3.10)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_12" failed
build (3.11)
Process completed with exit code 1.
build (3.8)
The strategy configuration was canceled because "build._3_12" failed
build (3.8)
The operation was canceled.