chore(deps-dev): bump the bundled group with 2 updates (#641) #1662
run-tests.yml
on: push
Matrix: run-tests
[Required] Tests passed
4s
Annotations
3 errors
|
Tests on ubuntu-latest with node 23
The job has exceeded the maximum execution time of 6h0m0s
|
|
Tests on ubuntu-latest with node 23
The operation was canceled.
|
|
[Required] Tests passed
Process completed with exit code 1.
|