Skip to content

fix tests

fix tests #46

Triggered via push November 27, 2025 12:56
Status Failure
Total duration 23s
Artifacts

sdk-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
Process completed with exit code 1.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
Process completed with exit code 1.