Change airbyte update connection API to public patch method #756
Annotations
7 errors
|
Run specs (3.3, rails-8.0)
Process completed with exit code 1.
|
|
Run specs (3.4, rails-8.0)
The strategy configuration was canceled because "test._3_3_rails-8_0" failed
|
|
Run specs (3.4, rails-8.0)
The operation was canceled.
|
|
Run specs (3.3, rails-7.2)
The strategy configuration was canceled because "test._3_3_rails-8_0" failed
|
|
Run specs (3.3, rails-7.2)
The operation was canceled.
|
|
Run specs (3.4, rails-7.2)
The strategy configuration was canceled because "test._3_3_rails-8_0" failed
|
|
Run specs (3.4, rails-7.2)
The operation was canceled.
|