Skip to content

Commit 96c0ba5

Browse files
authored
ci: ignore devflow/* jobs for all-green status (#13440)
## Checklist - [x] PR author has checked that all the criteria below are met - The PR description includes an overview of the change - The PR description articulates the motivation for the change - The change includes tests OR the PR description describes a testing strategy - The PR description notes risks associated with the change, if any - Newly-added code is easy to change - The change follows the [library release note guidelines](https://ddtrace.readthedocs.io/en/stable/releasenotes.html) - The change includes or references documentation updates if necessary - Backport labels are set (if [applicable](https://ddtrace.readthedocs.io/en/latest/contributing.html#backporting)) ## Reviewer Checklist - [x] Reviewer has checked that all the criteria below are met - Title is accurate - All changes are related to the pull request's stated goal - Avoids breaking [API](https://ddtrace.readthedocs.io/en/stable/versioning.html#interfaces) changes - Testing strategy adequately addresses listed risks - Newly-added code is easy to change - Release note makes sense to a user of the library - If necessary, author has acknowledged and discussed the performance implications of this PR as reported in the benchmarks PR comment - Backport labels are set in a manner that is consistent with the [release branch maintenance policy](https://ddtrace.readthedocs.io/en/latest/contributing.html#backporting)
1 parent e54c5bc commit 96c0ba5

File tree

1 file changed

+3
-2
lines changed

1 file changed

+3
-2
lines changed

.github/workflows/all-green.yml

Lines changed: 3 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -18,14 +18,15 @@ jobs:
1818
with:
1919
initial-delay-seconds: 10 # wait for this delay before starting
2020
polling-interval-seconds: 1 # after a failure, how long do it wait before checking again
21-
max-retries: 60 # how many retries before stopping
21+
max-retries: 60 # how many retries before stopping
2222
ignored-name-patterns: |
2323
Bootstrap import analysis
2424
require-checklist
2525
Validate changelog
26+
devflow/*
2627
2728
# Why some checks are excluded?
2829
#
2930
# - Bootstrap import analysis: TO BE ADDED (Success rate of 88% as of 2025-04-17)
3031
# - require-checklist: this job is triggered by a change on PR description, and already explcititly required
31-
# - Validate changelog: this job is triggered by a change on labels, and already explcititly required
32+
# - Validate changelog: this job is triggered by a change on labels, and already explcititly required

0 commit comments

Comments
 (0)