Skip to content

🎯 Epic: Groups Service Implementation & Test Coverage Analysis #22

@Devasy

Description

@Devasy

🎯 Project Overview

This epic tracks the comprehensive implementation and testing of the Groups Service as part of PR #15. This includes identifying test coverage gaps and ensuring production readiness.

πŸ“Š PR #15 Analysis Summary

  • Files Changed: 10 files
  • Lines Added: 1,295 additions, 10 deletions
  • Scope: Complete Groups API with routes, service layer, schemas, and tests

πŸ—οΈ Implementation Status

βœ… Completed Components

  • Groups Service Module (backend/app/groups/)

    • service.py - Business logic with 297 lines
    • routes.py - 10 API endpoints with 127 lines
    • schemas.py - Pydantic models with 53 lines
    • __init__.py - Package initialization
  • Comprehensive Documentation

    • README.md - 174 lines of detailed API documentation
    • Usage examples and integration notes
  • Test Coverage

    • test_groups_routes.py - 258 lines of API endpoint tests
    • test_groups_service.py - 367 lines of service layer tests
  • Infrastructure Updates

    • Updated main.py to include groups router
    • Enhanced conftest.py for groups service testing

πŸ§ͺ Test Coverage Analysis

βœ… Well-Covered Areas

  • Route Tests (13 test cases):

    • βœ… Create group (success & validation)
    • βœ… List user groups
    • βœ… Get group details & not found scenarios
    • βœ… Update group metadata
    • βœ… Delete group
    • βœ… Join group by code
    • βœ… Leave group
    • βœ… Get group members
    • βœ… Update member role
    • βœ… Remove member
  • Service Tests (15 test cases):

    • βœ… Join code generation
    • βœ… Document transformation
    • βœ… Group creation
    • βœ… User groups retrieval
    • βœ… Join group scenarios (success, invalid code, already member)
    • βœ… Admin permission checks
    • βœ… Last admin protection logic
    • βœ… Member management edge cases

⚠️ Test Coverage Gaps Identified

1. Authentication & Authorization Edge Cases

  • Test with expired JWT tokens
  • Test with malformed authorization headers
  • Test cross-tenant data access prevention
  • Test with missing authentication

2. Business Logic Edge Cases

  • Test join code collision handling (retry logic)
  • Test concurrent group creation with same name
  • Test group creation with very long names (boundary testing)
  • Test currency validation beyond default USD

3. Database Error Scenarios

  • Test MongoDB connection failures
  • Test database timeout scenarios
  • Test ObjectId validation edge cases
  • Test concurrent member operations

4. Integration Test Gaps

  • End-to-end workflow tests (create β†’ join β†’ manage β†’ leave)
  • Test with real database operations (not just mocks)
  • Test authentication integration with actual JWT validation

5. Performance & Load Testing

  • Test with large member lists (100+ members)
  • Test concurrent join/leave operations
  • Test join code lookup performance

6. Error Response Consistency

  • Validate all error responses follow standard format
  • Test error message internationalization ready
  • Test detailed error information without sensitive data

πŸ”„ Integration Dependencies

βœ… Current Integrations Working

  • Auth Service Integration - Uses get_current_user dependency
  • Database Integration - MongoDB operations with proper ObjectId handling
  • Test Infrastructure - Mock database properly configured

⚠️ Missing/Future Integrations

  • Expense Service Integration - TODOs identified:
    • Line 196: Balance check for leave_group
    • Line 288: Balance check for remove_member
  • Notification Service - Not yet implemented
  • Real-time Updates - WebSocket notifications missing

🎯 Remaining Tasks

Phase 1: Test Coverage Completion (High Priority)

  • Add Authentication Edge Case Tests

    • Invalid/expired tokens
    • Cross-tenant security tests
    • Permission boundary testing
  • Add Business Logic Edge Cases

    • Join code collision scenarios
    • Concurrent operations
    • Boundary value testing
  • Add Integration Tests

    • End-to-end user workflows
    • Real database integration tests
    • Cross-service integration preparation

Phase 2: Production Readiness (Medium Priority)

  • Performance Testing

    • Load testing with large groups
    • Concurrent operation testing
    • Database query optimization validation
  • Security Hardening

    • Rate limiting testing
    • Input sanitization validation
    • SQL injection prevention
  • Error Handling Enhancement

    • Standardize error response format
    • Add proper logging integration
    • Implement graceful degradation

Phase 3: Future Enhancements (Low Priority)

  • Expense Service Integration

    • Implement balance check service
    • Add settlement validation
    • Update TODOs in leave/remove operations
  • Advanced Features

    • Group analytics preparation
    • Bulk operations support
    • Advanced permissions model

πŸ“‹ Acceptance Criteria

βœ… Currently Met

  • All 10 API endpoints implemented and tested
  • Comprehensive service layer with business logic
  • Proper error handling and HTTP status codes
  • Admin protection and role validation
  • Join code system working
  • Database operations optimized
  • Documentation complete

⚠️ Still Required

  • Test Coverage >90% - Currently missing edge cases
  • Security Testing Complete - Auth edge cases needed
  • Performance Validation - Load testing required
  • Integration Ready - Expense service hooks prepared

🏷️ Labels

epic, groups-service, testing, pr-analysis, project-tracking

πŸ”— Related Items

Metadata

Metadata

Assignees

No one assigned

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions