-
Notifications
You must be signed in to change notification settings - Fork 12
Open
Description
The beamline energy change process currently involve automatically closed FE and reopened after energy moved.
The grating selection must be manually adjusted by the user if the new energy point requires a different grating.
Goals
Acceptance criteria :
- Decision on should the FE opening in plan or device?
- Decision on should/can the grating change be automatic according to the lookuptable?
Extra goals:
- Closing the FE during energy change.
- Option to change grating when energy of the beamline is change.**
Metadata
Metadata
Assignees
Labels
No labels