Skip to content

Run test workflow with Murfey and ISPyB databases #2424

Run test workflow with Murfey and ISPyB databases

Run test workflow with Murfey and ISPyB databases #2424

Triggered via push November 6, 2025 11:46
Status Failure
Total duration 5m 27s
Artifacts 1

test.yml

on: push
Static Analysis
12s
Static Analysis
Build package
12s
Build package
Build package
7s
Build package
Matrix: Call ci unit tests workflow / Run tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
Call ci unit tests workflow / Run tests (3.11)
Process completed with exit code 1.
Call ci unit tests workflow / Run tests (3.10)
The strategy configuration was canceled because "tests.test._3_11" failed
Call ci unit tests workflow / Run tests (3.10)
The operation was canceled.
Call ci unit tests workflow / Run tests (3.12)
The strategy configuration was canceled because "tests.test._3_11" failed
Call ci unit tests workflow / Run tests (3.12)
A task was canceled.
Call ci unit tests workflow / Run tests (3.12)
Back off 23.59 seconds before retry.
Call ci unit tests workflow / Run tests (3.12)
Failed to download action 'https://api.github.com/repos/actions/download-artifact/tarball/d3f86a106a0bac45b974a628896c90dbdf5c8093'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.

Artifacts

Produced during runtime
Name Size Digest
database
195 KB
sha256:8b50455c2bbd8102b77034633fcf2e972774220ce6464a21f43d511d9bfad8df