Run test workflow with Murfey and ISPyB databases #2424
Annotations
5 errors and 2 warnings
|
Call ci unit tests workflow / Run tests (3.11)
Process completed with exit code 1.
|
|
Call ci unit tests workflow / Run tests (3.10)
The strategy configuration was canceled because "tests.test._3_11" failed
|
|
Call ci unit tests workflow / Run tests (3.10)
The operation was canceled.
|
|
Call ci unit tests workflow / Run tests (3.12)
The strategy configuration was canceled because "tests.test._3_11" failed
|
|
Call ci unit tests workflow / Run tests (3.12)
A task was canceled.
|
|
Call ci unit tests workflow / Run tests (3.12)
Back off 23.59 seconds before retry.
|
|
Call ci unit tests workflow / Run tests (3.12)
Failed to download action 'https://api.github.com/repos/actions/download-artifact/tarball/d3f86a106a0bac45b974a628896c90dbdf5c8093'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
database
|
195 KB |
sha256:8b50455c2bbd8102b77034633fcf2e972774220ce6464a21f43d511d9bfad8df
|
|