Skip to content

1 in 7 - When is one required? (25.M.1.j) #29

@acrobid

Description

@acrobid

All pilots must receive one 24-hour period free from duty in any seven-day period (12.C.1.b).

  • Given 24 hours-plus on a layover, a day off, or an international buffer counts as the pilot’s 1-in-7.
  • If there is no assignment, one must be notified before beginning the R-day that they is released to qualify for a 1-in-7.
  • e.g., a pilot has a string of 10 consecutive days of reserve and hasn’t been used after six days. CRS must call before the seventh R-day and release the pilot from the requirement to be available for notification for that seventh day. The pilot must then be available on the eighth day.
  • e.g., a reserve on RA for a six-day block will be removed on Day 6 for a 1-in-7 if the pilot sat the phone availability period from 1200 to 0130 before Day 1 (i.e., did not acknowledge a crew notification of release to show of a trip prior to phone availability Day 1).

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions