description: "Anchor installation (suction, driven, helical, DEA, SEPLA) with tensioning and verification."
67
67
68
68
retrieve_anchor:
@@ -76,8 +76,8 @@ retrieve_anchor:
76
76
- crane
77
77
- pump_subsea
78
78
- positioning_system
79
-
duration_h: 4
80
-
Hs_m:: 2.5
79
+
duration_h
80
+
Hs_m
81
81
description: "Anchor retrieval, including break-out and recovery to deck."
82
82
83
83
@@ -92,8 +92,8 @@ load_mooring:
92
92
- positioning_system
93
93
operator: # the entity with the crane (like the port or the new vessel)
94
94
- crane
95
-
duration_h: 2
96
-
Hs_m:: 2.5
95
+
duration_h
96
+
Hs_m
97
97
description: "Load-out of mooring lines and components from port or vessel onto vessel."
98
98
99
99
@@ -107,8 +107,8 @@ lay_mooring:
107
107
- bollard_pull
108
108
- mooring_work
109
109
- positioning_system
110
-
duration_h: 6
111
-
Hs_m:: 2.5
110
+
duration_h
111
+
Hs_m
112
112
description: "Laying mooring lines, tensioning and connection to anchors and floaters."
113
113
114
114
@@ -125,8 +125,8 @@ mooring_hookup:
125
125
- mooring_work
126
126
- positioning_system
127
127
- monitoring_system
128
-
duration_h: 2
129
-
Hs_m:: 2.5
128
+
duration_h
129
+
Hs_m
130
130
description: "Hook-up of mooring lines to floating platforms, including pretensioning."
131
131
132
132
# --- Heavy Lift & Installation ---
@@ -139,8 +139,8 @@ install_wec:
139
139
- positioning_system
140
140
- monitoring_system
141
141
- rov
142
-
duration_h: 20
143
-
Hs_m:: 2.0
142
+
duration_h
143
+
Hs_m
144
144
description: "Lifting, placement and securement of wave energy converters (WECs) onto moorings, including alignment, connection of power/data umbilicals and verification via ROV."
145
145
146
146
install_semisub:
@@ -156,8 +156,8 @@ install_semisub:
156
156
- sonar_survey
157
157
- pump_surface
158
158
- mooring_work
159
-
duration_h: 36
160
-
Hs_m:: 2.5
159
+
duration_h
160
+
Hs_m
161
161
description: "Wet tow arrival, station-keeping, ballasting/trim, mooring hookup and pretensioning, ROV verification and umbilical connections as needed."
162
162
163
163
install_spar:
@@ -172,8 +172,8 @@ install_spar:
172
172
- sonar_survey
173
173
- pump_surface
174
174
- mooring_work
175
-
duration_h: 48
176
-
Hs_m:: 2.0
175
+
duration_h
176
+
Hs_m
177
177
description: "Arrival and upending via controlled ballasting, station-keeping, fairlead/messenger handling, mooring hookup and pretensioning with ROV confirmation. Heavy-lift support may be used during port integration."
178
178
179
179
install_tlp:
@@ -188,8 +188,8 @@ install_tlp:
188
188
- rov
189
189
- sonar_survey
190
190
- mooring_work
191
-
duration_h: 60
192
-
Hs_m:: 2.0
191
+
duration_h
192
+
Hs_m
193
193
description: "Tendon porch alignment, tendon hookup, sequential tensioning to target pretension, verification of offsets/RAOs and ROV checks."
194
194
195
195
install_wtg:
@@ -199,8 +199,8 @@ install_wtg:
199
199
- crane
200
200
- positioning_system
201
201
- monitoring_system
202
-
duration_h: 24
203
-
Hs_m:: 2.0
202
+
duration_h
203
+
Hs_m
204
204
description: "Installation of wind turbine generator including tower, nacelle and blades."
205
205
206
206
# --- Cable Operations ---
@@ -213,8 +213,8 @@ lay_cable:
213
213
- monitoring_system
214
214
- cable_reel
215
215
- sonar_survey
216
-
duration_h: 24
217
-
Hs_m:: 2.5
216
+
duration_h
217
+
Hs_m
218
218
description: "Laying static/dynamic power cables, including burial where required."
219
219
220
220
retrieve_cable:
@@ -224,8 +224,8 @@ retrieve_cable:
224
224
- positioning_system
225
225
- monitoring_system
226
226
- cable_reel
227
-
duration_h: 12
228
-
Hs_m:: 2.5
227
+
duration_h
228
+
Hs_m
229
229
description: "Cable recovery operations, including cutting, grappling and retrieval."
230
230
231
231
# Lay and bury in a single pass using a plough
@@ -238,8 +238,8 @@ lay_and_bury_cable:
238
238
- cable_reel
239
239
- cable_plough
240
240
- sonar_survey
241
-
duration_h: 30
242
-
Hs_m: 2.5
241
+
duration_h
242
+
Hs_m
243
243
description: "Simultaneous lay and plough burial; continuous QA via positioning + MBES/SSS, with post-pass verification."
244
244
245
245
# Backfill trench or stabilize cable route using rock placement
@@ -251,8 +251,8 @@ backfill_rockdump:
251
251
- monitoring_system
252
252
- sonar_survey
253
253
- rock_placement
254
-
duration_h: 16
255
-
Hs_m: 2.5
254
+
duration_h
255
+
Hs_m
256
256
description: "Localized rock placement to stabilize exposed cables, infill trenches or provide scour protection. Includes real-time positioning and sonar verification of rock placement."
257
257
258
258
# --- Survey & Monitoring ---
@@ -263,8 +263,8 @@ site_survey:
263
263
- positioning_system
264
264
- sonar_survey
265
265
- monitoring_system
266
-
duration_h: 48
267
-
Hs_m: 3.0
266
+
duration_h
267
+
Hs_m
268
268
description: "Pre-installation site survey including bathymetry, sub-bottom profiling and positioning."
269
269
270
270
monitor_installation:
@@ -273,6 +273,6 @@ monitor_installation:
273
273
- positioning_system
274
274
- monitoring_system
275
275
- rov
276
-
duration_h: 12
277
-
Hs_m: 3.0
276
+
duration_h
277
+
Hs_m
278
278
description: "Real-time monitoring of installation operations using ROV and sensor packages."