You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: README.md
+1-1Lines changed: 1 addition & 1 deletion
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -163,7 +163,7 @@ Besides that general Best Practice, there is nothing Special to consider - Plan
163
163
- Else **Boarding** will start automatically **after Refuel and Catering** (if configured) are **finished**.
164
164
- The PCA will be removed anytime the **APU is running** and the APU **Bleed is On**.
165
165
- The Stairs will be removed **as soon as the Boarding** Service is reported as **finished** (if configured).
166
-
-**Both Loadsheets** will be transmitted 90 - 150 Seconds **after the Boarding and Refueling** Service is reported as **finished**. On **Reception** the **Doors are closed** (if still open), you will hear the Cabin **"Ding" Sound** and see the **"Aircraft Loaded"** Notification in the EFB.
166
+
- The **Final Loadsheet** will be transmitted 90 - 150 Seconds **after Boarding and Refueling** Service is reported as **finished**. On **Reception** the **Doors are closed** (if still open), you will hear the Cabin **"Ding" Sound** and see the **"Aircraft Loaded"** Notification in the EFB.
167
167
- It is recommended to **wait with Pushback** until you received the **Final LS**. (Fenix2GSX needs to trigger an "Instant Load" and I don't know if that is a good Idea when the Airplane started moving)
168
168
- The **Removal** of **Ground-Equipment** is triggered by **two Situations**:
169
169
- Parking **Brake Set** AND External **Power Off** AND **Beacon On**.
0 commit comments