Add river routing module #1964
workflow.yml
on: pull_request
spack_build
/
Spack Build (ESMF stable)
6m 24s
Matrix: build_gcm
Annotations
8 errors
|
build_gcm (gfortran-14, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-14)
Process completed with exit code 2.
|
|
build_gcm (gfortran-15, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-15)
The strategy configuration was canceled because "build_gcm.gfortran-14_Debug" failed
|
|
build_gcm (gfortran-15, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-15)
Process completed with exit code 2.
|
|
build_gcm (ifort, Debug) / Build GEOS-ESM/GEOSgcm (ifort)
The strategy configuration was canceled because "build_gcm.gfortran-14_Debug" failed
|
|
build_gcm (ifort, Debug) / Build GEOS-ESM/GEOSgcm (ifort)
The operation was canceled.
|
|
spack_build / Spack Build (ESMF stable)
Process completed with exit code 2.
|
|
Build Tests
The strategy configuration was canceled because "build_gcm.gfortran-14_Debug" failed
|
|
Build Tests
The strategy configuration was canceled because "build_gcm.gfortran-14_Debug" failed
|