Skip to content

Add river routing module #1970

Add river routing module

Add river routing module #1970

Triggered via pull request December 11, 2025 19:22
Status Failure
Total duration 21m 27s
Artifacts

workflow.yml

on: pull_request
spack_build  /  Spack Build (ESMF stable)
21m 24s
spack_build / Spack Build (ESMF stable)
Matrix: build_gcm
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build_gcm (ifort, Debug) / Build GEOS-ESM/GEOSgcm (ifort)
Process completed with exit code 2.
build_gcm (gfortran-14, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-14)
The strategy configuration was canceled because "build_gcm.ifort_Debug" failed
build_gcm (gfortran-14, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-14)
The operation was canceled.
build_gcm (gfortran-15, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-15)
The strategy configuration was canceled because "build_gcm.ifort_Debug" failed
build_gcm (gfortran-15, Debug) / Build GEOS-ESM/GEOSgcm (gfortran-15)
The operation was canceled.
spack_build / Spack Build (ESMF stable)
Process completed with exit code 2.
Build Tests
The strategy configuration was canceled because "build_gcm.ifort_Debug" failed
Build Tests
The strategy configuration was canceled because "build_gcm.ifort_Debug" failed