Skip to content

chore: support static connection info #2858

chore: support static connection info

chore: support static connection info #2858

Triggered via pull request January 3, 2025 18:30
Status Failure
Total duration 6h 0m 23s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

tests.yaml

on: pull_request
Matrix: integration tests
Matrix: unit tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
unit tests (windows-latest, 3.9)
Event loop is closed
unit tests (windows-latest, 3.9)
Event loop is closed
unit tests (windows-latest, 3.9)
Event loop is closed
unit tests (ubuntu-latest, 3.13)
The job running on runner GitHub Actions 499 has exceeded the maximum execution time of 360 minutes.
unit tests (ubuntu-latest, 3.13)
The operation was canceled.
unit tests (ubuntu-latest, 3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636