Skip to content

Latest commit

 

History

History
3 lines (3 loc) · 665 Bytes

File metadata and controls

3 lines (3 loc) · 665 Bytes

DOI

tep

Transmission expansion planning (TEP) model for the U.S. Western Interconnection. This model utilizes linear programming (LP) to optimize high voltage transmission line investment decisions by considering representative grid conditions in each month of a future year. This tool includes an embedded economic dispatch (ED) model to simulate grid operations. In order to initialize an electricity grid dataset for the TEP model, users need to create a future year scenario with Grid Operations (GO) modeling framework.