Skip to content

[CP-126] add support exchange v2 #378

[CP-126] add support exchange v2

[CP-126] add support exchange v2 #378

Triggered via pull request May 22, 2025 19:16
Status Failure
Total duration 6h 0m 21s
Artifacts

run-tests.yml

on: pull_request
Matrix: run-tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
run-tests (3.10, windows-latest)
Event loop is closed
run-tests (3.11, windows-latest)
Event loop is closed
run-tests (3.9, windows-latest)
The job running on runner GitHub Actions 88 has exceeded the maximum execution time of 360 minutes.
run-tests (3.9, windows-latest)
The operation was canceled.