Skip to content

fix: add pre-commit deps #115

fix: add pre-commit deps

fix: add pre-commit deps #115

Triggered via push March 14, 2025 11:10
Status Failure
Total duration 25s
Artifacts

ci.yml

on: push
Matrix: tests
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

12 errors
tests (3.8)
Process completed with exit code 2.
tests (3.7)
Process completed with exit code 2.
tests (3.7)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.11)
The operation was canceled.
tests (3.11)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.12)
The operation was canceled.
tests (3.12)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.10)
The operation was canceled.
tests (3.10)
The strategy configuration was canceled because "tests._3_8" failed
tests (3.9)
The operation was canceled.
tests (3.9)
The strategy configuration was canceled because "tests._3_8" failed
lint
Process completed with exit code 127.