Skip to content

Latest commit

 

History

History
174 lines (132 loc) · 3.41 KB

File metadata and controls

174 lines (132 loc) · 3.41 KB

CI/CD

Project: Interact - Employee Engagement & Gamification Platform
Last Updated: January 14, 2026
Status: Planned - Q1 2026


Overview

This document describes the Continuous Integration and Continuous Deployment pipeline for Interact.

Current Status: Manual deployments. CI/CD implementation planned for Q1 2026.


CI/CD Pipeline Architecture

Code Push
  ↓
GitHub Actions Triggered
  ↓
┌─────────────────┐
│  Build Stage    │
│  - Install deps │
│  - Run linter   │
│  - Type check   │
│  - Build app    │
└────────┬────────┘
         │
┌────────▼────────┐
│  Test Stage     │
│  - Unit tests   │
│  - Integration  │
│  - E2E tests    │
│  - Coverage     │
└────────┬────────┘
         │
┌────────▼────────┐
│ Security Stage  │
│  - SAST scan    │
│  - Dependency   │
│  - Secret scan  │
└────────┬────────┘
         │
┌────────▼────────┐
│  Deploy Stage   │
│  - Staging      │
│  - Smoke tests  │
│  - Production   │
└─────────────────┘

GitHub Actions Workflows

CI Workflow (.github/workflows/ci.yml)

name: CI

on: [push, pull_request]

jobs:
  build:
    runs-on: ubuntu-latest
    steps:
      - uses: actions/checkout@v3
      - uses: actions/setup-node@v3
        with:
          node-version: '18'
      
      - name: Install dependencies
        run: npm ci
      
      - name: Lint
        run: npm run lint
      
      - name: Type check
        run: npm run typecheck
      
      - name: Build
        run: npm run build
      
      - name: Test
        run: npm test -- --coverage
      
      - name: Upload coverage
        uses: codecov/codecov-action@v3
        with:
          files: ./coverage/lcov.info

Deployment Strategies

Staging Deployment

  • Automatic on merge to develop branch
  • Full test suite must pass
  • Deploy to staging environment
  • Run smoke tests

Production Deployment

  • Automatic on merge to main branch
  • Requires manual approval
  • Blue-green deployment
  • Gradual rollout (10% → 50% → 100%)

Quality Gates

PR Checks (Required to Pass)

  • ✅ All tests pass
  • ✅ Code coverage ≥ 70%
  • ✅ No linting errors
  • ✅ No security vulnerabilities
  • ✅ Build succeeds
  • ✅ 1+ approving review

Deployment Checks

  • ✅ All CI checks pass
  • ✅ No critical bugs in staging
  • ✅ Performance benchmarks met
  • ✅ Security scan clear

Rollback Procedures

Automatic Rollback Triggers

  • Error rate > 5%
  • Response time > 3 seconds
  • Failed health checks

Manual Rollback

# Revert to previous version
base44 deploy --version previous

# Or specify version
base44 deploy --version v1.2.3

Monitoring & Alerts

Deployment Monitoring

  • Error rates
  • Response times
  • User traffic
  • Resource utilization

Alert Channels

  • Slack #deployments
  • Email to on-call engineer
  • PagerDuty (critical only)

Related Documentation


Document Owner: DevOps Team
Last Updated: January 14, 2026