Skip to content

feat(ocap-kernel): add BIP39 mnemonic support for kernel identity seed recovery #3366

feat(ocap-kernel): add BIP39 mnemonic support for kernel identity seed recovery

feat(ocap-kernel): add BIP39 mnemonic support for kernel identity seed recovery #3366

Triggered via pull request January 27, 2026 22:42
Status Cancelled
Total duration 5m 32s
Artifacts

main.yml

on: pull_request
Check if pull request can skip merge queue
3s
Check if pull request can skip merge queue
Check workflows
5s
Check workflows
Matrix: Lint, build, and test / Prepare
Code scanner  /  Run security scan
2m 49s
Code scanner / Run security scan
Matrix: Lint, build, and test / Build
Matrix: Lint, build, and test / E2E Tests
Matrix: Lint, build, and test / Integration Tests
Matrix: Lint, build, and test / Lint
Matrix: Lint, build, and test / Test
Matrix: Lint, build, and test / Validate changelog
All jobs complete
All jobs complete
Determine whether this is a release merge commit
Determine whether this is a release merge commit
Coverage report  /  Report
Coverage report / Report
Publish coverage to GitHub Pages  /  Publish to GitHub Pages
Publish coverage to GitHub Pages / Publish to GitHub Pages
All jobs pass
4s
All jobs pass
Publish release  /  publish-release
Publish release / publish-release
Publish release  /  Dry run publish to NPM
Publish release / Dry run publish to NPM
Publish release  /  Publish to NPM
Publish release / Publish to NPM
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 4 warnings
Lint, build, and test / Test (20.x)
Canceling since a higher priority waiting request for Main-refs/pull/780/merge exists
Lint, build, and test / Test (20.x)
The operation was canceled.
Lint, build, and test / Test (24.x)
Canceling since a higher priority waiting request for Main-refs/pull/780/merge exists
Lint, build, and test / Test (24.x)
The operation was canceled.
Lint, build, and test / E2E Tests (24.x)
Canceling since a higher priority waiting request for Main-refs/pull/780/merge exists
Lint, build, and test / E2E Tests (24.x)
The operation was canceled.
Lint, build, and test / Test (22.x)
Canceling since a higher priority waiting request for Main-refs/pull/780/merge exists
Lint, build, and test / Test (22.x)
The operation was canceled.
All jobs pass
Process completed with exit code 1.
Main
Canceling since a higher priority waiting request for Main-refs/pull/780/merge exists
Main
Canceling since a higher priority waiting request for Main-refs/pull/780/merge exists
Lint, build, and test / Prepare (20.x)
Cache save failed.
Lint, build, and test / Prepare (22.x)
Cache save failed.
Lint, build, and test / Prepare (24.x)
Cache save failed.
Code scanner / Run security scan
CodeQL Action v3 will be deprecated in December 2026. Please update all occurrences of the CodeQL Action in your workflow files to v4. For more information, see https://github.blog/changelog/2025-10-28-upcoming-deprecation-of-codeql-action-v3/