Skip to content

Commit 05316be

Browse files
authored
Merge pull request #107298 from priestlg/gdpBug48371-031120
Fix for bug #48371.
2 parents e4d4fdb + 33485cc commit 05316be

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

articles/databox/data-box-heavy-deploy-set-up.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -97,7 +97,7 @@ Take the following steps to cable your device.
9797

9898
On one of the nodes of the device, take the following steps to cable for network.
9999

100-
1. Use a CAT 6 RJ-45 network cable (blue cable in the picture) to connect the host computer to the 1-Gbps management port.
100+
1. Use a CAT 6 RJ-45 network cable (top-right cable in picture, attached to plug labeled MGMT) to connect the host computer to the 1-Gbps management port.
101101
2. Use a QSFP+ cable (fiber or copper) to connect at least one 40-Gbps (preferred over 1 Gbps) network interface for data. If using a 10-Gbps switch, use an SFP+ cable with a QSFP+ to SFP+ adapter (the QSA adapter) to connect the 40 Gbps network interface for data.
102102

103103
![Data Box Heavy ports cabled](media/data-box-heavy-deploy-set-up/data-box-heavy-ports-cabled.png)

0 commit comments

Comments
 (0)