You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: articles/databox-online/data-box-edge-deploy-install.md
+2-13Lines changed: 2 additions & 13 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -7,7 +7,7 @@ author: alkohli
7
7
ms.service: databox
8
8
ms.subservice: edge
9
9
ms.topic: tutorial
10
-
ms.date: 05/31/2019
10
+
ms.date: 01/17/2020
11
11
ms.author: alkohli
12
12
Customer intent: As an IT admin, I need to understand how to install Data Box Edge in datacenter so I can use it to transfer data to Azure.
13
13
---
@@ -149,21 +149,10 @@ Locate the components for installing the rail kit assembly:
149
149
150
150

151
151
152
-
### Route the cables
153
-
154
-
> [!NOTE]
155
-
> If you did not order the optional Cable Management Arm (CMA), use the two hook and loop straps provided in the rail kit to route the cables at the back of your system.
156
-
157
-
1. Locate the outer CMA brackets on the interior sides of both rack flanges.
158
-
2. Bundle the cables gently, pulling them clear of the system connectors to the left and right sides.
159
-
3. Thread the hook and loop straps through the slots on the outer CMA brackets on each side of the system to secure the cable bundles.
160
-
161
-
162
-

163
152
164
153
## Cable the device
165
154
166
-
The following procedures explain how to cable your Data Box Edge device for power and network.
155
+
Route the cables and then cable your device. The following procedures explain how to cable your Data Box Edge device for power and network.
167
156
168
157
Before you start cabling your device, you need the following:
0 commit comments