-| Facilities | Facilities & Infrastructure | DC Facilities - Lease and Power | The Facilities cost is based on a colocation model, which includes space, power, and lease costs per kWh.<br> Annual facilities cost = Total energy capacity * Average colocation costs * 12. (Assume 40% of datacenter energy capacity remains unused.) <br> Total energy capacity = Energy consumption by current workloads / (1 - unused energy capacity). <br>To determine energy consumption for your workloads: <br>**Compute resources**: Total physical cores * On-Prem TDP (0.009 kWh per core) * Load factor (2.00) * On-Prem PUE (1.80).<br> **Storage resources**: Total storage in TB * On-Prem storage power rating (10 kWh per TB) * Conversion factor (0.0001) * Load factor (2.00) * On-Prem PUE (1.80). |
0 commit comments