You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: articles/migrate/concepts-business-case-calculation.md
+3-3Lines changed: 3 additions & 3 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -140,17 +140,17 @@ Cost components for running on-premises servers. For TCO calculations, an annual
140
140
|| Software - Windows Server licensing | License cost | Calculated per two core pack license pricing of Windows Server. |
141
141
|| Windows Server - Extended Security Update (ESU) | License cost | Calculated for 3 years after the end of support of Windows server license: <br/><br/> ESU (Year 1) – 75% of the license cost <br/><br/> ESU (Year 2) – 100% of the license cost <br/><br/> ESU (Year 3) – 125% of the license cost <br/><br/>|
142
142
||| Software Assurance | Calculated per year as in settings. |
143
-
|| Virtualization software for servers running in VMware environment | Virtualization Software (VMware license cost + support) | License cost for vSphere Standard license + Production support for vSphere Standard license. *Not included- other hypervisor software cost* or *Antivirus / Monitoring Agents*.|
143
+
|| Virtualization software for servers running in VMware environment | Virtualization Software (VMware license cost) | License cost based on VMware Cloud Foundation licensing.|
144
144
| Storage | Storage Hardware || The total storage hardware acquisition cost is calculated by multiplying the Total volume of storage attached to per GB cost. Default is USD 2 per GB per month. |
145
145
|| Storage Maintenance || Default is 10% of storage hardware acquisition cost. |
146
146
| Network | Network Hardware and software | Network equipment (Cabinets, switches, routers, load balancers etc.) and software | As an industry standard and used by sellers in Business cases, it's a % of compute and storage cost. Default is 10% of storage and compute cost. |
147
147
|| Maintenance | Maintenance | Defaulted to 15% of network hardware and software cost. |
148
148
| Security | General Servers | Server security cost | Default is USD 250 per year per server. This is multiplied with number of servers (General servers)|
149
149
|| SQL Servers | SQL protection cost | Default is USD 1000 per year per server. This is multiplied with number of servers running SQL |
150
-
| Facilities | Facilities & Infrastructure | DC Facilities - Lease and Power | Facilities cost isn't applicable for Azure cost. |
150
+
| Facilities | Facilities & Infrastructure | DC Facilities - Lease and Power | The facilities cost is based on a colocation model, which includes space, power, and lease costs per kWh.<br> Annual facilities cost = Total energy capacity * Average colocation costs ($340 per kWh per month) * 12. Assume 40% of datacenter energy capacity remains unused.<br> Total energy capacity = Energy consumption by current workloads / (1 - unused energy capacity). <br>To determine energy consumption for your workloads: <br>
151
+
<br> - Compute resources: Total physical cores * On-Prem TDP (0.009 kWh per core) * Load factor (2.00) * On-Prem PUE (1.80).<br> - Storage resources: Total storage in TB * On-Prem storage power rating (10 kWh per TB) * Conversion factor (0.0001) * Load factor (2.00) * On-Prem PUE (1.80). |
151
152
| Labor | Labor | IT admin | DC admin cost = ((Number of virtual machines) / (Avg. # of virtual machines that can be managed by a full-time administrator)) * 730 * 12 |
152
153
| Management | Management Software licensing | System center Management software | Used for cost of the System center management software that includes monitoring, hardware and virtual machine provisioning, automation, backup and configuration management capabilities. Cost of Microsoft system center management software is added when the system center agents are identified on any of the discovered resources. This is applicable only for windows servers and SQL servers related scenarios and includes Software assurance. |
153
-
||| VMware Vcenter Management software | This is the cost associated with VMware management software i.e. Management software cost for vSphere Standard + production support cost of management software. Not included- other hypervisor software cost or Antivirus/Monitoring Agents. |
154
154
||| Other Management software | This is the cost of the management software for Partner management products. |
155
155
|| Management cost other than software | Monitoring cost | Specify costs other than monitoring software. Default is USD 430 per year per server. This is multiplied with the number of servers. The default used is the cost associated with a monitoring administrator. |
156
156
||| Patch Management cost | Specify costs other than patch management software. Default is USD 430 per year per server. This is multiplied with the number of servers. Default is the cost associated with a patch management administrator. |
0 commit comments