You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: articles/active-directory/hybrid/reference-connect-faq.md
+1-1Lines changed: 1 addition & 1 deletion
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -108,7 +108,7 @@ The following is an informational document that presents some of the best practi
108
108
- Staging servers are not meant to be a High Availability solution, but you can have multiple staging servers
109
109
- Introducing a "Lag" Staging Servers could mitigate some potential downtime in case of error
110
110
- Test and Validate all upgrades on the Staging Server first
111
-
- Always validate exports before switching over to the staging serverLeverage the staging server for Full Imports and Full Synchronizations to reduce business impact
111
+
- Always validate exports before switching over to the staging server. Leverage the staging server for Full Imports and Full Synchronizations to reduce business impact
112
112
- Keep version consistency between Azure AD Connect Servers as much as possible
113
113
114
114
**Q: Can I allow Azure AD Connect to create the Azure AD Connector account on Workgroup machine?**
0 commit comments