You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: articles/databox/data-box-deploy-copy-data-via-copy-service.md
+5-9Lines changed: 5 additions & 9 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -87,8 +87,7 @@ To copy data by using the data copy service, you need to create a job:
87
87
88
88
- You can cancel a job at any time:
89
89
90
-

91
-
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/click-create.png" alt-text="Screenshot of the Copy Data page highlighting the location of the Create button." lightbox="media/data-box-deploy-copy-data-via-copy-service/click-create-lrg.png":::
90
+
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/cancel-job.png" alt-text="Screenshot of the Copy Data page highlighting the location of the Create button. Cancel a job on the 'Copy data' page" lightbox="media/data-box-deploy-copy-data-via-copy-service/cancel-job-lrg.png":::
92
91
93
92
When you cancel a job, a confirmation is required:
94
93
@@ -103,8 +102,7 @@ To copy data by using the data copy service, you need to create a job:
103
102
104
103
- You can restart a failed job that arises from a transient error, such as a network glitch. However, a job can't be restarted after it reaches a terminal status, such as **Succeeded** or **Completed with errors**. Errors resulting from file-naming or file-size issues are logged, but the job can't be restarted after it completes.
105
104
106
-

107
-
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/click-create.png" alt-text="Screenshot of the Copy Data page highlighting the location of the Create button." lightbox="media/data-box-deploy-copy-data-via-copy-service/click-create-lrg.png":::
105
+
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/restart-failed-job.png" alt-text="Screenshot of the Copy Data page highlighting the location of the Restart a failed job." lightbox="media/data-box-deploy-copy-data-via-copy-service/restart-failed-job-lrg.png":::
108
106
109
107
If you experience a failure and can't restart the job, download the error logs and locate the underlying failure. After correcting the issue, create a new job to copy the files. Alternatively, you can also [copy the files over SMB](data-box-deploy-copy-data.md).
110
108
@@ -131,13 +129,11 @@ To copy data by using the data copy service, you need to create a job:
131
129
132
130
Wait for the copy job to finish. Because some errors are logged only on the **Connect and copy** page, ensure that the copy job is complete and reports no errors before advancing to the next step.
133
131
134
-

135
-
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/click-create.png" alt-text="Screenshot of the Copy Data page highlighting the location of the Create button." lightbox="media/data-box-deploy-copy-data-via-copy-service/click-create-lrg.png":::
132
+
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/verify-no-errors-on-connect-and-copy.png" alt-text="Screenshot of the No errors on 'Connect and copy' page Copy Data page highlighting the location of the Create button." lightbox="media/data-box-deploy-copy-data-via-copy-service/verify-no-errors-on-connect-and-copy-lrg.png":::
136
133
137
134
To ensure data integrity, a checksum is computed inline as the data is copied. After the copy is complete, select **View dashboard** to verify the used space and free space on your device.
138
-
139
-

140
-
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/click-create.png" alt-text="Screenshot of the Copy Data page highlighting the location of the Create button." lightbox="media/data-box-deploy-copy-data-via-copy-service/click-create-lrg.png":::
135
+
136
+
:::image type="content" source="media/data-box-deploy-copy-data-via-copy-service/verify-used-space-dashboard.png" alt-text="Screenshot of the Verify free and used space on dashboard Copy Data page highlighting the location of the Create button." lightbox="media/data-box-deploy-copy-data-via-copy-service/verify-used-space-dashboard-lrg.png":::
141
137
142
138
After the copy job is finished, you can select **Prepare to ship**.
0 commit comments