Skip to content

Commit 61c1c58

Browse files
Update articles/machine-learning/how-to-auto-train-forecast.md
Co-authored-by: Samantha Salgado <[email protected]>
1 parent cc8f7fa commit 61c1c58

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

articles/machine-learning/how-to-auto-train-forecast.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -300,7 +300,7 @@ Use the best model iteration to forecast values for data that wasn't used to tra
300300

301301
Before you put a model into production, you should evaluate its accuracy on a test set held out from the training data. A best practice procedure is a so-called rolling evaluation which rolls the trained forecaster forward in time over the test set, averaging error metrics over several prediction windows to obtain statistically robust estimates for some set of chosen metrics. Ideally, the test set for the evaluation is long relative to the model's forecast horizon. Estimates of forecasting error may otherwise be statistically noisy and, therefore, less reliable.
302302

303-
For example, suppose you train a model on historic, daily sales to predict demand up to two weeks (14 days) into the future. If there is sufficient historic data available, you might reserve the final several months to even a year of the data for the test set. The rolling evaluation begins by generating a 14-day-ahead forecast for the first two weeks of the test set. Then, the forecaster is advanced by some number of days into the test set and you generate another 14-day-ahead forecast from the new position. The process continues until you get to the end of the test set.
303+
For example, suppose you train a model on daily sales to predict demand up to two weeks (14 days) into the future. If there is sufficient historic data available, you might reserve the final several months to even a year of the data for the test set. The rolling evaluation begins by generating a 14-day-ahead forecast for the first two weeks of the test set. Then, the forecaster is advanced by some number of days into the test set and you generate another 14-day-ahead forecast from the new position. The process continues until you get to the end of the test set.
304304

305305
To do a rolling evaluation, you call the `rolling_forecast` method of the `fitted_model`, then compute desired metrics on the result. For example, assume you have test set features in a pandas DataFrame called `test_features_df` and the test set actual values of the target in a numpy array called `test_target`. A rolling evaluation using the mean squared error is shown in the following code sample: