Skip to content

Commit 69274f3

Browse files
committed
improve score
1 parent 1dc10f3 commit 69274f3

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

articles/operator-nexus/howto-cluster-runtime-upgrade.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -150,7 +150,7 @@ The cordon and drain process for Nexus Kubernetes cluster nodes on Bare Metal Ho
150150

151151
Once the cordon and drain process of the tenant cluster VMs in the BMH is complete, the BMH upgrade proceeds. The tenant cluster node drain timeout is set to 10 minutes; if draining takes longer, the BMH upgrade will still proceed after this timeout. Since this process happens in parallel, the overall maximum wait time for the entire rack is 10 minutes. After the BMH upgrade is complete and the BMH rejoins the bare metal cluster, the tenant cluster VM will be uncordoned.
152152

153-
It's also important to remember that there won't be a shutdown of tenant cluster VMs after the cordon and drain process, and the BMH will be temporarily offline for the upgrade. Additionally, the cordon and drain feature is not triggered by BMH power-off and restart actions on the Nexus Kubernetes node; it's only activated for Nexus runtime upgrades.
153+
It's also important to remember that there won't be a shutdown of tenant cluster VMs after the cordon and drain process, and the BMH will be temporarily offline for the upgrade. Additionally, the cordon and drain feature isn't triggered by BMH power-off and restart actions on the Nexus Kubernetes node; it's only activated for Nexus runtime upgrades.
154154

155155
<!-- LINKS - External -->
156156
[installation-instruction]: https://aka.ms/azcli

0 commit comments

Comments
 (0)