Skip to content

Commit 8550ba8

Browse files
authored
Merge pull request #78439 from alkohli/edge
Added the image for the front plane of the device
2 parents 8bbc652 + 049b438 commit 8550ba8

File tree

2 files changed

+41
-31
lines changed

2 files changed

+41
-31
lines changed

articles/databox-online/data-box-edge-deploy-install.md

Lines changed: 41 additions & 31 deletions
Original file line numberDiff line numberDiff line change
@@ -7,7 +7,7 @@ author: alkohli
77
ms.service: databox
88
ms.subservice: edge
99
ms.topic: tutorial
10-
ms.date: 03/20/2019
10+
ms.date: 05/31/2019
1111
ms.author: alkohli
1212
Customer intent: As an IT admin, I need to understand how to install Data Box Edge in datacenter so I can use it to transfer data to Azure.
1313
---
@@ -65,7 +65,7 @@ This device is shipped in a single box. Complete the following steps to unpack y
6565
1. Place the box on a flat, level surface.
6666
2. Inspect the box and the packaging foam for crushes, cuts, water damage, or any other obvious damage. If the box or packaging is severely damaged, don't open it. Contact Microsoft Support to help you assess whether the device is in good working order.
6767
3. Unpack the box. After unpacking the box, make sure that you have:
68-
- One single enclosure Edge device
68+
- One single enclosure Data Box Edge device
6969
- Two power cords
7070
- One rail kit assembly
7171
- A Safety, Environmental, and Regulatory Information booklet
@@ -95,19 +95,19 @@ Locate the components for installing the rail kit assembly:
9595
1. Two A7 Dell ReadyRails II sliding rail assemblies
9696
2. Two hook and loop straps
9797

98-
![Identify rail kit contents](./media/data-box-edge-deploy-install/identify-rail-kit-contents.png)
98+
![Identify rail kit contents](./media/data-box-edge-deploy-install/identify-rail-kit-contents.png)
9999

100100
### Install and remove tool-less rails (Square hole or round hole racks)
101101

102102
> [!TIP]
103103
> This option is tool-less because it does not require tools to install and remove the rails into the unthreaded square or round holes in the racks.
104104
105-
1. Position the left and right rail end pieces labeled **FRONT** facing inward and orient each end piece to seat in the holes on the front side of the vertical rack flanges .
105+
1. Position the left and right rail end pieces labeled **FRONT** facing inward and orient each end piece to seat in the holes on the front side of the vertical rack flanges.
106106
2. Align each end piece in the bottom and top holes of the desired U spaces.
107-
3. Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks into place. Repeat these steps to position and seat the front end piece on the vertical rack flange.
107+
3. Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks into place. Repeat these steps to position and seat the front-end piece on the vertical rack flange.
108108
4. To remove the rails, pull the latch release button on the end piece midpoint and unseat each rail.
109109

110-
![Install and remove tool-less rails](./media/data-box-edge-deploy-install/installing-removing-tool-less-rails.png)
110+
![Install and remove tool-less rails](./media/data-box-edge-deploy-install/installing-removing-tool-less-rails.png)
111111

112112
### Install and remove tooled rails (Threaded hole racks)
113113

@@ -119,7 +119,7 @@ Locate the components for installing the rail kit assembly:
119119
3. Attach the left and right mounting rails to the front vertical rack flanges using two pairs of screws.
120120
4. Slide the left and right back brackets forward against the rear vertical rack flanges and attach them using two pairs of screws.
121121

122-
![Install and remove tooled rails](./media/data-box-edge-deploy-install/installing-removing-tooled-rails.png)
122+
![Install and remove tooled rails](./media/data-box-edge-deploy-install/installing-removing-tooled-rails.png)
123123

124124
### Install the system in a rack
125125

@@ -128,15 +128,15 @@ Locate the components for installing the rail kit assembly:
128128
3. Push the system inward until the lock levers click into place.
129129
4. Press the slide-release lock buttons on both rails and slide the system into the rack.
130130

131-
![Install system in a rack](./media/data-box-edge-deploy-install/installing-system-rack.png)
131+
![Install system in a rack](./media/data-box-edge-deploy-install/installing-system-rack.png)
132132

133133
### Remove the system from the rack
134134

135135
1. Locate the lock levers on the sides of the inner rails.
136136
2. Unlock each lever by rotating it up to its release position.
137137
3. Grasp the sides of the system firmly and pull it forward until the rail standoffs are at the front of the J-slots. Lift the system up and away from the rack and place it on a level surface.
138138

139-
![Remove system from the rack](./media/data-box-edge-deploy-install/removing-system-rack.png)
139+
![Remove system from the rack](./media/data-box-edge-deploy-install/removing-system-rack.png)
140140

141141
### Engage and release the slam latch
142142

@@ -147,7 +147,7 @@ Locate the components for installing the rail kit assembly:
147147
2. The latches engage automatically as the system is pushed into the rack and are released by pulling up on the latches.
148148
3. To secure the system for shipment in the rack or for other unstable environments, locate the hard-mount screw under each latch and tighten each screw with a #2 Phillips screwdriver.
149149

150-
![Engage and release slam latch](./media/data-box-edge-deploy-install/engaging-releasing-slam-latch.png)
150+
![Engage and release slam latch](./media/data-box-edge-deploy-install/engaging-releasing-slam-latch.png)
151151

152152
### Route the cables
153153

@@ -159,51 +159,63 @@ Locate the components for installing the rail kit assembly:
159159
3. Thread the hook and loop straps through the slots on the outer CMA brackets on each side of the system to secure the cable bundles.
160160

161161

162-
![Route the cables](./media/data-box-edge-deploy-install/routing-cables.png)
162+
![Route the cables](./media/data-box-edge-deploy-install/routing-cables.png)
163163

164164
## Cable the device
165165

166-
The following procedures explain how to cable your Edge device for power and network.
166+
The following procedures explain how to cable your Data Box Edge device for power and network.
167167

168168
Before you start cabling your device, you need the following:
169169

170-
- Your Edge physical device, unpacked, and rack mounted.
171-
- Two power cables.
170+
- Your Data Box Edge physical device, unpacked, and rack mounted.
171+
- Two power cables.
172172
- At least one 1-GbE RJ-45 network cable to connect to the management interface. There are two 1-GbE network interfaces, one management and one data, on the device.
173173
- One 25-GbE SFP+ copper cable for each data network interface to be configured. At least one data network interface from among PORT 2, PORT 3, PORT 4, PORT 5, or PORT 6 needs to be connected to the Internet (with connectivity to Azure).
174174
- Access to two power distribution units (recommended).
175175

176176
> [!NOTE]
177177
> - If you are connecting only one data network interface, we recommend that you use a 25/10-GbE network interface such as PORT 3, PORT 4, PORT 5, or PORT 6 to send data to Azure.
178178
> - For best performance and to handle large volumes of data, consider connecting all the data ports.
179-
> - The Edge device should be connected to the datacenter network so that it can ingest data from data source servers.
179+
> - The Data Box Edge device should be connected to the datacenter network so that it can ingest data from data source servers.
180180
181-
Your Edge device has 8 NVMe SSDs. The front panel also has status LEDs and power buttons. The device includes redundant power supply units (PSUs) at the back. Your device has six network interfaces:
181+
On your Data Box Edge device:
182182

183-
- Two 1-Gbps interfaces
184-
- Four 25-Gbps interfaces that can also serve as 10-Gbps interfaces.
185-
- A baseboard management controller (BMC).
183+
- The front panel has disk drives and a power button.
186184

187-
Identify the various ports on the backplane of your device.
188-
189-
![Backplane of a cabled device](./media/data-box-edge-deploy-install/backplane-cabled.png)
185+
- There are 10 disk slots in the front of your device.
186+
- Slot 0 has a 240-GB SATA drive used as an operating system disk. Slot 1 is empty and slots 2 to 9 are NVMe SSDs used as data disks.
187+
- The back plane includes redundant power supply units (PSUs).
188+
- The back plane has six network interfaces:
189+
190+
- Two 1-Gbps interfaces.
191+
- Four 25-Gbps interfaces that can also serve as 10-Gbps interfaces.
192+
- A baseboard management controller (BMC).
190193

191-
The device has two network cards corresponding to the 6 ports:
194+
- The back plane has two network cards corresponding to the 6 ports:
192195

193-
- QLogic FastLinQ 41264
194-
- QLogic FastLinQ 41262
196+
- QLogic FastLinQ 41264
197+
- QLogic FastLinQ 41262
195198

196199
For a full list of supported cables, switches, and transceivers for these network cards, go to [Cavium FastlinQ 41000 Series Interoperability Matrix](https://www.marvell.com/documents/xalflardzafh32cfvi0z/).
197200

198201
Take the following steps to cable your device for power and network.
199202

200-
1. Connect the power cords to each of the PSUs in the enclosure. To ensure high availability, install and connect both PSUs to different power sources.
203+
1. Identify the various ports on the back plane of your device.
204+
205+
![Back plane of a cabled device](./media/data-box-edge-deploy-install/backplane-cabled.png)
201206

202-
2. Attach the power cords to the rack power distribution units (PDUs). Make sure that the two PSUs use separate power sources.
207+
2. Locate the disk slots and the power button on the front of the device.
203208

204-
3. Connect the 1-GbE network interface PORT 1 to the computer that's used to configure the physical device. PORT 1 is the dedicated management interface.
209+
![Front plane of a device](./media/data-box-edge-deploy-install/device-front-plane-labeled-1.png)
205210

206-
4. Connect one or more of PORT 2, PORT 3, PORT 4, PORT 5, or PORT 6 to the datacenter network/Internet. If connecting PORT 2, use the RJ-45 network cable. For the 10/25-GbE network interfaces, use the SFP+ copper cables.
211+
3. Connect the power cords to each of the PSUs in the enclosure. To ensure high availability, install and connect both PSUs to different power sources.
212+
4. Attach the power cords to the rack power distribution units (PDUs). Make sure that the two PSUs use separate power sources.
213+
5. Press the power button to turn on the device.
214+
6. Connect the 1-GbE network interface PORT 1 to the computer that's used to configure the physical device. PORT 1 is the dedicated management interface.
215+
7. Connect one or more of PORT 2, PORT 3, PORT 4, PORT 5, or PORT 6 to the datacenter network/Internet.
216+
217+
- If connecting PORT 2, use the RJ-45 network cable.
218+
- For the 10/25-GbE network interfaces, use the SFP+ copper cables.
207219

208220
## Next steps
209221

@@ -218,5 +230,3 @@ Advance to the next tutorial to learn how to connect, set up, and activate your
218230

219231
> [!div class="nextstepaction"]
220232
> [Connect and set up Data Box Edge](./data-box-edge-deploy-connect-setup-activate.md)
221-
222-
29.2 KB