Skip to content

Commit 8b2abf4

Browse files
Merge pull request #288721 from duongau/patch-11
ExpressRoute - Gateway migration (add note about migration time)
2 parents 8058c02 + a8619c9 commit 8b2abf4

File tree

1 file changed

+3
-0
lines changed

1 file changed

+3
-0
lines changed

articles/expressroute/gateway-migration.md

Lines changed: 3 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -39,6 +39,9 @@ Historically, users had to use the Resize-AzVirtualNetworkGateway PowerShell com
3939

4040
With the guided gateway migration experience you can deploy a second virtual network gateway in the same GatewaySubnet and Azure automatically transfers the control plane and data path configuration from the old gateway to the new one. During the migration process, there will be two virtual network gateways in operation within the same GatewaySubnet. This feature is designed to support migrations without downtime. However, users may experience brief connectivity issues or interruptions during the migration process.
4141

42+
> [!NOTE]
43+
> The total time required for the migration to complete can take up to one hour. During this period, the gateway will remain locked, and no changes will be permitted.
44+
4245
Gateway migration is recommended if you have a non-Az enabled Gateway SKU or a non-Az enabled Gateway Basic IP Gateway SKU.
4346

4447
| Migrate from Non-Az enabled Gateway SKU | Migrate to Az-enabled Gateway SKU |

0 commit comments

Comments
 (0)