Skip to content

Commit 96ad7aa

Browse files
committed
basic change
1 parent f63e048 commit 96ad7aa

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

articles/update-manager/manage-pre-post-events.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -41,7 +41,7 @@ For example, if a maintenance schedule is set to start at **3:00 PM**, with the
4141
|7:15 PM| After the patch installation, the post event runs for 20 mins. </br>In this example, the post event is initiated at 6:55 PM and completed by 7:15 PM and if you have a shorter maintenance window, the post event is triggered at 5:00 PM and completed by 5:20 PM. |
4242

4343
>[!IMPORTANT]
44-
> Make sure to allocate atleast 40 minutes before the scheduled maintenance run time (3:00 PM in above example) otherwise it might lead to auto-cancellation of that particular scheduled run.
44+
> Make sure to have atleast 40 minutes before the scheduled maintenance run time (3:00 PM in above example) otherwise it might lead to auto-cancellation of that particular scheduled run.
4545
4646
## Configure pre and post events on existing schedule
4747

0 commit comments

Comments
 (0)