You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: articles/expressroute/gateway-migration.md
+3-3Lines changed: 3 additions & 3 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -99,11 +99,11 @@ You have up to 15 days to commit after migration preparation. Use this time to v
99
99
100
100
Azure Advisor notifications will alert you if your gateway requires migration. Attempting to migrate an ineligible gateway will result in an error. For more details, see [Troubleshooting Gateway Migration](gateway-migration-error-messaging.md).
101
101
102
-
### Can I roll-back this change?
103
-
Yes, until it is committed. The migration is comprised of four major steps:
102
+
### Can I rollback this change?
103
+
Yes, until it is committed. The migration is composed of four major steps:
104
104
105
105
1. Validate – Confirms if your gateway is eligible for migration.
106
-
No changes at this stage; nothing to roll-back
106
+
No changes at this stage; nothing to rollback
107
107
108
108
2. Prepare – Creates a new Virtual Network Gateway with the desired configuration.
109
109
The process can be aborted after step 2 and the new gateway will be deleted.
0 commit comments