Skip to content

Commit 9e66e7a

Browse files
authored
Update advisor-cost-recommendations.md
1 parent a0b191b commit 9e66e7a

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

articles/advisor/advisor-cost-recommendations.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -74,7 +74,7 @@ A burstable SKU recommendation is made if:
7474
* The average **CPU utilization** is less than a burstable SKUs' baseline performance
7575
* If the P95 of CPU is less than two times the burstable SKUs' baseline performance
7676
* If the current SKU doesn't have accelerated networking enabled, since burstable SKUs don't support accelerated networking yet
77-
* If we determine that the Burstable SKU credits are sufficient to support the average CPU utilization over 7 days. Note that you can change your lookback period in the configurations.
77+
* If we determine that the Burstable SKU credits are sufficient to support the average CPU utilization over 7 days. You can change your lookback period in the configurations.
7878

7979
The resulting recommendation suggests that a user should resize their current virtual machine or virtual machine scale set to a burstable SKU with the same number of cores. This suggestion is made so a user can take advantage of lower cost and also the fact that the workload has low average utilization but high spikes in cases, which can be best served by the B-series SKU.
8080

0 commit comments

Comments
 (0)