articles/virtual-machines/workloads/oracle/oracle-design.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -62,7 +62,7 @@ If you have an existing an Oracle Enterprise Edition database and are planning t
6262

6363
Consider running your AWR report during both regular and peak workloads, so you can compare. To collect the more accurate workload, consider an extended window report of one week, as opposed to one day. AWR provides averages as part of its calculations in the report. By default, the AWR repository retains eight days of data and takes snapshots at hourly intervals.
6464

65-
For a datacenter migration, you should to gather reports for sizing on the production systems. Estimate remaining database copies used for user testing, test, and development by percentages. For example, estimate 50 percent of production sizing.
65+
For a datacenter migration, you should gather reports for sizing on the production systems. Estimate remaining database copies used for user testing, test, and development by percentages. For example, estimate 50 percent of production sizing.
6666

6767
To run an AWR report from the command line, use the following command: