Skip to content

Commit deda7ae

Browse files
committed
fix link
1 parent 9e3aa29 commit deda7ae

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

articles/sap/workloads/hana-vm-operations.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -111,7 +111,7 @@ Another description on how to use Azure NVAs to control and monitor access from
111111

112112
## Configuring Azure infrastructure for SAP HANA scale-out
113113

114-
In order to find out the Azure VM types that are certified for either OLAP scale-out or S/4HANA scale-out, check the [SAP HANA hardware directory](https://www.sap.com/dmc/exp/2014-09-02-hana-hardware/enEN/iaas.html#categories=Microsoft%20Azure). A checkmark in the column 'Clustering' indicates scale-out support. Application type indicates whether OLAP scale-out or S/4HANA scale-out is supported. For details on nodes certified in scale-out, review the entry for a specific VM SKU listed in the SAP HANA hardware directory.
114+
In order to find out the Azure VM types that are certified for either OLAP scale-out or S/4HANA scale-out, check the [SAP HANA hardware directory](https://www.sap.com/dmc/exp/2014-09-02-hana-hardware/enEN/#/solutions?filters=v:deCertified;iaas;ve:24). A checkmark in the column 'Clustering' indicates scale-out support. Application type indicates whether OLAP scale-out or S/4HANA scale-out is supported. For details on nodes certified in scale-out, review the entry for a specific VM SKU listed in the SAP HANA hardware directory.
115115

116116
The minimum OS releases for deploying scale-out configurations in Azure VMs, check the details of the entries in the particular VM SKU listed in the SAP HANA hardware directory. Of a n-node OLAP scale-out configuration, one node functions as the main node. The other nodes up to the limit of the certification act as worker node. More standby nodes don't count into the number of certified nodes
117117

0 commit comments

Comments
 (0)