You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Copy file name to clipboardExpand all lines: articles/databox-online/data-box-edge-deploy-install.md
+11-13Lines changed: 11 additions & 13 deletions
Display the source diff
Display the rich diff
Original file line number
Diff line number
Diff line change
@@ -65,7 +65,7 @@ This device is shipped in a single box. Complete the following steps to unpack y
65
65
1. Place the box on a flat, level surface.
66
66
2. Inspect the box and the packaging foam for crushes, cuts, water damage, or any other obvious damage. If the box or packaging is severely damaged, don't open it. Contact Microsoft Support to help you assess whether the device is in good working order.
67
67
3. Unpack the box. After unpacking the box, make sure that you have:
68
-
- One single enclosure Edge device
68
+
- One single enclosure Data Box Edge device
69
69
- Two power cords
70
70
- One rail kit assembly
71
71
- A Safety, Environmental, and Regulatory Information booklet
@@ -95,7 +95,7 @@ Locate the components for installing the rail kit assembly:
95
95
1. Two A7 Dell ReadyRails II sliding rail assemblies
### Install and remove tool-less rails (Square hole or round hole racks)
101
101
@@ -107,7 +107,7 @@ Locate the components for installing the rail kit assembly:
107
107
3. Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks into place. Repeat these steps to position and seat the front end piece on the vertical rack flange.
108
108
4. To remove the rails, pull the latch release button on the end piece midpoint and unseat each rail.
109
109
110
-

110
+

111
111
112
112
### Install and remove tooled rails (Threaded hole racks)
113
113
@@ -119,7 +119,7 @@ Locate the components for installing the rail kit assembly:
119
119
3. Attach the left and right mounting rails to the front vertical rack flanges using two pairs of screws.
120
120
4. Slide the left and right back brackets forward against the rear vertical rack flanges and attach them using two pairs of screws.
121
121
122
-

122
+

123
123
124
124
### Install the system in a rack
125
125
@@ -128,15 +128,15 @@ Locate the components for installing the rail kit assembly:
128
128
3. Push the system inward until the lock levers click into place.
129
129
4. Press the slide-release lock buttons on both rails and slide the system into the rack.
130
130
131
-

131
+

132
132
133
133
### Remove the system from the rack
134
134
135
135
1. Locate the lock levers on the sides of the inner rails.
136
136
2. Unlock each lever by rotating it up to its release position.
137
137
3. Grasp the sides of the system firmly and pull it forward until the rail standoffs are at the front of the J-slots. Lift the system up and away from the rack and place it on a level surface.
138
138
139
-

139
+

140
140
141
141
### Engage and release the slam latch
142
142
@@ -147,7 +147,7 @@ Locate the components for installing the rail kit assembly:
147
147
2. The latches engage automatically as the system is pushed into the rack and are released by pulling up on the latches.
148
148
3. To secure the system for shipment in the rack or for other unstable environments, locate the hard-mount screw under each latch and tighten each screw with a #2 Phillips screwdriver.
149
149
150
-

150
+

151
151
152
152
### Route the cables
153
153
@@ -159,15 +159,15 @@ Locate the components for installing the rail kit assembly:
159
159
3. Thread the hook and loop straps through the slots on the outer CMA brackets on each side of the system to secure the cable bundles.
160
160
161
161
162
-

162
+

163
163
164
164
## Cable the device
165
165
166
-
The following procedures explain how to cable your Edge device for power and network.
166
+
The following procedures explain how to cable your Data Box Edge device for power and network.
167
167
168
168
Before you start cabling your device, you need the following:
169
169
170
-
- Your Edge physical device, unpacked, and rack mounted.
170
+
- Your Data Box Edge physical device, unpacked, and rack mounted.
171
171
- Two power cables.
172
172
- At least one 1-GbE RJ-45 network cable to connect to the management interface. There are two 1-GbE network interfaces, one management and one data, on the device.
173
173
- One 25-GbE SFP+ copper cable for each data network interface to be configured. At least one data network interface from among PORT 2, PORT 3, PORT 4, PORT 5, or PORT 6 needs to be connected to the Internet (with connectivity to Azure).
@@ -176,7 +176,7 @@ Before you start cabling your device, you need the following:
176
176
> [!NOTE]
177
177
> - If you are connecting only one data network interface, we recommend that you use a 25/10-GbE network interface such as PORT 3, PORT 4, PORT 5, or PORT 6 to send data to Azure.
178
178
> - For best performance and to handle large volumes of data, consider connecting all the data ports.
179
-
> - The Edge device should be connected to the datacenter network so that it can ingest data from data source servers.
179
+
> - The Data Box Edge device should be connected to the datacenter network so that it can ingest data from data source servers.
180
180
181
181
On your Data Box Edge device:
182
182
@@ -230,5 +230,3 @@ Advance to the next tutorial to learn how to connect, set up, and activate your
230
230
231
231
> [!div class="nextstepaction"]
232
232
> [Connect and set up Data Box Edge](./data-box-edge-deploy-connect-setup-activate.md)
0 commit comments