Skip to content

PoC for 902: to be re-engineered #553

PoC for 902: to be re-engineered

PoC for 902: to be re-engineered #553

Triggered via pull request November 26, 2025 15:03
Status Failure
Total duration 20m 24s
Artifacts 1

pr-deploy-and-test.yml

on: pull_request
deploy-pr-backend  /  terraform-plan
34s
deploy-pr-backend / terraform-plan
deploy-pr-backend  /  terraform-apply
3m 24s
deploy-pr-backend / terraform-apply
Matrix: run-e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
run-e2e-tests (internal-dev-sandbox) / wait-for-deployment
Process completed with exit code 1.
PR Deploy and Test
The strategy configuration was canceled because "run-e2e-tests.internal-dev-sandbox" failed
run-e2e-tests (internal-dev) / wait-for-deployment
The strategy configuration was canceled because "run-e2e-tests.internal-dev-sandbox" failed
run-e2e-tests (internal-dev) / wait-for-deployment
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
dev-pr-1007-tfplan
210 KB
sha256:2f3aac619696475df585da4743280613601caccf8aa0e860e0a22b029afacd76