Skip to content

PoC for 902: to be re-engineered #564

PoC for 902: to be re-engineered

PoC for 902: to be re-engineered #564

Re-run triggered November 27, 2025 09:55
Status Failure
Total duration 18m 54s
Artifacts 1

pr-deploy-and-test.yml

on: pull_request
deploy-pr-backend  /  terraform-plan
38s
deploy-pr-backend / terraform-plan
deploy-pr-backend  /  terraform-apply
2m 4s
deploy-pr-backend / terraform-apply
Matrix: run-e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
run-e2e-tests (internal-dev) / wait-for-deployment
Process completed with exit code 1.
run-e2e-tests (internal-dev-sandbox) / wait-for-deployment
The strategy configuration was canceled because "run-e2e-tests.internal-dev" failed
run-e2e-tests (internal-dev-sandbox) / wait-for-deployment
Process completed with exit code 1.
PR Deploy and Test
The strategy configuration was canceled because "run-e2e-tests.internal-dev" failed

Artifacts

Produced during runtime
Name Size Digest
dev-pr-1007-tfplan Expired
210 KB
sha256:2e10a8a3b7992351984816fb2b1ec8efcec099c257a9e9b12bb93dfdcf7386a4