Skip to content

VED-366 Set up internal QA env and stop CD into int #754

VED-366 Set up internal QA env and stop CD into int

VED-366 Set up internal QA env and stop CD into int #754

Triggered via pull request December 10, 2025 14:36
Status Failure
Total duration 19m 59s
Artifacts 1

pr-deploy-and-test.yml

on: pull_request
deploy-pr-backend  /  terraform-plan
39s
deploy-pr-backend / terraform-plan
deploy-pr-backend  /  terraform-apply
3m 0s
deploy-pr-backend / terraform-apply
Matrix: run-e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
run-e2e-tests (internal-dev-sandbox) / wait-for-deployment
Process completed with exit code 1.
run-e2e-tests (internal-dev) / wait-for-deployment
The strategy configuration was canceled because "run-e2e-tests.internal-dev-sandbox" failed
run-e2e-tests (internal-dev) / wait-for-deployment
The operation was canceled.
PR Deploy and Test
The strategy configuration was canceled because "run-e2e-tests.internal-dev-sandbox" failed

Artifacts

Produced during runtime
Name Size Digest
dev-pr-908-tfplan
210 KB
sha256:081e08b39d888736dc96213ac46940e57b6778d3a4ad2f85b6e455b83d1bbece