Skip to content

Northeastern future tasks as of 12/8/25 #12

@augustposch

Description

@augustposch
  • Simulate more rivers covering the Boston subway system to fully simulate its resilience
  • Hourly hydrologic models to remove the hydrograph assumption
  • Integrate new architectures for AI downscaler
  • Integrate LOCA as reference comparison for downscaling
  • Implement AI emulator for hydrodynamic model (adapting Taysi et al. 2024)
  • Extend POC to Mystic River to cover MBTA subway
  • Generalize end-to-end process to other cities (downscaling, flood modeling, urban rail network simulation)
  • Automatable data downloads
  • Automatable data processing for simulations
  • Uncertainty quantification

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions