Skip to content

switch multilevel duration problem #2645

@kdschlosser

Description

@kdschlosser

The duration value for a multilevel switch is flawed. If the device supports version 4 of the command class there is going to be a bumping of heads because the duration value is used by both the report command and also by the set command. If there is a current transition taking place there are going to be reports that contain the mount of time left. The bumping of heads is going to occur if there is a transition happening and the user wants to change the transition. They would set the duration and then set the level. If a report comes in after the user sets the duration but before the user sets the level the duration from the report is going to get used instead of the duration a user has set.

The fix would be to add a "target_duration" value just like there is a target_level value.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions