fix workflow os for linux #7
Annotations
5 errors and 1 warning
|
build (linux)
Process completed with exit code 101.
|
|
build (mac)
The operation was canceled.
|
|
build (mac)
The strategy configuration was canceled because "build.linux" failed
|
|
build (windows)
The operation was canceled.
|
|
build (windows)
The strategy configuration was canceled because "build.linux" failed
|
|
build (linux)
Cache not found for keys: v0-rust-build-Linux-x64-1bc25f80-cee2a8a0, v0-rust-build-Linux-x64-1bc25f80
|