Skip to content

Commit 5286a2c

Browse files
upgrade kit docs
1 parent 8d01da4 commit 5286a2c

39 files changed

+314
-10
lines changed

src/components/Card.js

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -7,7 +7,7 @@ import Link from '@docusaurus/Link'; // Import Link component for internal navig
77
const Card = ({ imageUrl, headerText, linkUrl, isNew }) => (
88
<Link to={linkUrl} className={styles.cardLink}>
99
<div className={styles.card}>
10-
{isNew && <div className={styles.newLabel}>New</div>}
10+
{isNew && <div className={styles.newLabel}>New</div>}
1111
<img src={require(`/static/img/${imageUrl}`).default} alt={headerText} className={styles.cardImage} />
1212
<h3 className={styles.cardHeader}>{headerText}</h3>
1313
</div>

src/components/Card.module.css

Lines changed: 8 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -20,15 +20,18 @@
2020
position: absolute;
2121
top: 10px; /* Adjust as necessary */
2222
right: 10px; /* Adjust as necessary */
23-
background-color: #5332CD; /* Choose color based on your design */
24-
color: white;
25-
padding: 5px 10px;
26-
border-radius: 5px; /* Rounded corners */
23+
background-color: rgba(83, 49, 202, 0.06);
24+
border: 1px solid rgba(83, 49, 202, 0.16);
25+
padding: 2px 6px;
26+
font-weight: 600;
27+
color: #4a3c82;
28+
border-radius: 999px;
2729
font-size: 0.9em;
28-
font-weight: bold;
2930
z-index: 1; /* Keep the badge above the zoomed image */
3031
}
3132

33+
34+
3235
.cardImage {
3336
width: 100%;
3437
height: 200px;
686 KB
Loading
1.61 MB
Loading
692 KB
Loading
967 KB
Loading
1.08 MB
Loading

user-guide/01-getting-started/01-assembly_guides/01_pioreactor_20ml_v1.5/03-20ml-v15-wetware-assembly.md

Lines changed: 1 addition & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -30,11 +30,8 @@ import TabItem from '@theme/TabItem';
3030
<AssemblyInstructionBlock title="Step 2: Inserting the O-rings" images={["user-guide/hardware-assembly/20ml-v15/oring-in-holder.jpg", "user-guide/hardware-assembly/20ml-v15/oring-groove.jpg", "user-guide/hardware-assembly/20ml-v15/oring-in-top.jpg", "user-guide/hardware-assembly/upgrade-version/thick-oring-into-bottom.png",
3131
"user-guide/hardware-assembly/20ml-v15/vial-holders-with-oring.jpg"]}>
3232

33-
1. The O-rings are pre-lubricated with a silicone-based lubricant. If needed, remove any excess lubricant from the O-rings.
3433
2. The top vial holder has <Highlight color={colors.blue}>a groove within the body</Highlight> where the <Highlight color={colors.magenta}>thinner #024 O-ring</Highlight> sits. Carefully insert the O-ring using your fingers. Make sure to not twist the O-ring.
3534
3. Run your finger inside the vial holder, pushing the O-ring into place to ensure a snug fit.
36-
4. The bottom vial holder has a groove for the <Highlight color={colors.orange}>thicker #121 O-ring</Highlight>. The O-ring will sit between the base of the holder and the heater PCB. Carefully insert the O-ring using your fingers. Make sure to not twist the O-ring.
37-
5. Push the O-ring into place to ensure a snug fit.
3835

3936
</AssemblyInstructionBlock>
4037

@@ -79,6 +76,6 @@ import TabItem from '@theme/TabItem';
7976
<AssemblyInstructionBlock title="Step 6: Complete the vial holder" images={["user-guide/hardware-assembly/20ml-v15/twist-top-and-bottom.jpg"]}>
8077

8178
1. Screw the top and bottom vial holder sections together so that the IR label is positioned above the flat-flex-cable.
82-
2. Set this aside and proceed to the next page.
79+
2. Set this aside and proceed to the next page.
8380

8481
</AssemblyInstructionBlock>
Lines changed: 37 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,37 @@
1+
---
2+
title: Disassembly
3+
slug: /20ml-v11-upgrade-v15-upgrade-disassembly
4+
---
5+
6+
import AssemblyInstructionBlock from '@site/src/components/AssemblyInstructionBlock';
7+
import Highlight from '@site/src/components/Highlight';
8+
import * as colors from '@site/src/components/constants';
9+
10+
import Tabs from '@theme/Tabs';
11+
import TabItem from '@theme/TabItem';
12+
13+
14+
<AssemblyInstructionBlock title="Step 1: Unplug and disassemble the optics system
15+
" images={["user-guide/hardware-assembly/upgrade_kits/remove_pds_leds.jpg","user-guide/hardware-assembly/upgrade_kits/disconnect_pds.jpg"]}>
16+
17+
1. Remove any vial placed in the Pioreactor.
18+
2. Remove the <Highlight color={colors.teal}>LED caps</Highlight> from **REF**, **IR** and **90°** sockets.
19+
3. Remove the LED and PDs from their sockets.
20+
:::caution
21+
If the LEDs/PDs are stuck in the socket, **do not pull!** Gently twist the bulb until it loosens from the socket to safely remove it.
22+
:::
23+
4. Unplug the <Highlight color={colors.red}>PDs only</Highlight> from the HAT. Leave the LED attached - this will be reused in the v1.5.
24+
25+
</AssemblyInstructionBlock>
26+
27+
<AssemblyInstructionBlock title="Step 2: Replace the top vial holder
28+
" images={["user-guide/hardware-assembly/upgrade_kits/remove_old_vial_holder.jpg","user-guide/hardware-assembly/20ml-v15/oring-groove.jpg", "user-guide/hardware-assembly/20ml-v15/oring-in-top.jpg", "user-guide/hardware-assembly/upgrade_kits/attach_new_vial_holder.jpg",]}>
29+
30+
2. Screw off the existing top vial holder by twisting it counter-clockwise. This old top isn't needed anymore.
31+
2. The new top v1.5 vial holder has <Highlight color={colors.blue}>a groove within the body</Highlight> where the #024 O-ring sits. Carefully insert the O-ring using your fingers. Make sure to not twist the O-ring.
32+
3. Run your finger inside the vial holder, pushing the O-ring into place to ensure a snug fit.
33+
3. Screw on the new v1.5 vial holder.
34+
35+
</AssemblyInstructionBlock>
36+
37+
Lines changed: 26 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,26 @@
1+
---
2+
title: Wetware assembly
3+
slug: /20ml-v11-upgrade-v15-wetware-assembly
4+
hide_table_of_contents: true
5+
---
6+
7+
import AssemblyInstructionBlock from '@site/src/components/AssemblyInstructionBlock';
8+
import Highlight from '@site/src/components/Highlight';
9+
import * as colors from '@site/src/components/constants';
10+
11+
import Tabs from '@theme/Tabs';
12+
import TabItem from '@theme/TabItem';
13+
14+
15+
<AssemblyInstructionBlock title="Step 1: 20ml vial assembly" images={["user-guide/hardware-assembly/20ml-v15/20ml-vial-pieces.jpg","user-guide/hardware-assembly/40ml/steel-ports-into-holes.png","user-guide/hardware-assembly/40ml/steel-ports.png","user-guide/hardware-assembly/20ml-v15/20ml-vial.jpg"]}>
16+
17+
18+
1. Gather the 20ml vial, stirbar, and stainless steel ports.
19+
2. Remove the cap from the vial.
20+
3. Gently but firmly push the stainless steel ports into the four holes. The two straight ports are placed in the <Highlight color={colors.blue}>outer holes</Highlight>, and the two bent ports are placed in the <Highlight color={colors.orange}>inner holes</Highlight>.
21+
4. Position the ports about **half way** through the vial cap for now. These can be adjusted later.
22+
5. Place the stirbar in the vial and secure the cap.
23+
24+
</AssemblyInstructionBlock>
25+
26+

0 commit comments

Comments
 (0)