Skip to content

Merge pull request #82 from PostHog/feat/get-feature-flag-result #197

Merge pull request #82 from PostHog/feat/get-feature-flag-result

Merge pull request #82 from PostHog/feat/get-feature-flag-result #197

Triggered via push February 12, 2026 03:02
Status Failure
Total duration 54s
Artifacts

ci.yml

on: push
Static checks
48s
Static checks
Matrix: Build and test
Fit to window
Zoom out
Zoom in

Annotations

18 errors
Build and test (1.17.x, 25.x)
Process completed with exit code 2.
Build and test (1.17.x, 25.x): test/posthog/sender_test.exs#L51
test send/2 busy sender is ok if there are no available (PostHog.SenderTest)
Build and test (1.18.x, 25.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.18.x, 25.x)
The operation was canceled.
Build and test (1.18.x, 27.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.18.x, 27.x)
The operation was canceled.
Build and test (1.19.x, 27.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.19.x, 27.x)
The operation was canceled.
Build and test (1.17.x, 27.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.17.x, 27.x)
The operation was canceled.
Build and test (1.19.x, 28.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.19.x, 28.x)
The operation was canceled.
Build and test (1.18.x, 26.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.18.x, 26.x)
The operation was canceled.
Build and test (1.19.x, 26.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.17.x, 26.x)
The strategy configuration was canceled because "test._1_17_x_25_x" failed
Build and test (1.19.x, 26.x)
The operation was canceled.
Build and test (1.17.x, 26.x)
The operation was canceled.