Skip to content

Update integration-tests.yml #22

Update integration-tests.yml

Update integration-tests.yml #22

Triggered via push April 27, 2025 10:33
Status Failure
Total duration 12s
Artifacts

unit-tests.yml

on: push
Matrix: test-js-py
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test-js-py (20, 3.11)
Process completed with exit code 1.
test-js-py (20, 3.10)
Process completed with exit code 1.
test-js-py (20, 3.10)
The strategy configuration was canceled because "test-js-py._20_3_11" failed
test-js-py (18, 3.11)
Process completed with exit code 1.
test-js-py (18, 3.11)
The strategy configuration was canceled because "test-js-py._20_3_11" failed
test-js-py (18, 3.10)
Process completed with exit code 1.
test-js-py (18, 3.10)
The strategy configuration was canceled because "test-js-py._20_3_11" failed