Skip to content

Update superlinter.yml #28

Update superlinter.yml

Update superlinter.yml #28

Triggered via push April 27, 2025 18:04
Status Failure
Total duration 13s
Artifacts

unit-tests.yml

on: push
Matrix: test-js-py
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test-js-py (20, 3.10)
Process completed with exit code 1.
test-js-py (18, 3.10)
Process completed with exit code 1.
test-js-py (18, 3.10)
The strategy configuration was canceled because "test-js-py._20_3_10" failed
test-js-py (20, 3.11)
Process completed with exit code 1.
test-js-py (20, 3.11)
The strategy configuration was canceled because "test-js-py._20_3_10" failed
test-js-py (18, 3.11)
The operation was canceled.
test-js-py (18, 3.11)
The strategy configuration was canceled because "test-js-py._20_3_10" failed