H2 (g) pipeline,lifetime,2020,50,years,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
14
14
H2 (g) pipeline,FOM,2020,4,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
15
15
H2 (g) pipeline,FOM,2050,1.5,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
16
-
H2 (g) pipeline repurposed,investment,2020,116.90,EUR/MW/km,2020,"European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.","Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 500 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
16
+
H2 (g) pipeline repurposed,investment,2020,116.9,EUR/MW/km,2020,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.,"Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 500 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
17
17
H2 (g) pipeline repurposed,lifetime,2020,50,years,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
18
18
H2 (g) pipeline repurposed,FOM,2020,4,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
19
19
H2 (g) pipeline repurposed,FOM,2050,1.5,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
@@ -176,3 +176,39 @@ methanolisation,FOM,2030,3,%/year,2017,"Agora Energiewende (2018): The Future Co
176
176
methanolisation,investment,2050,500000,EUR/MW_MeOH,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 8: “Reference scenario”.","Well developed technology, no significant learning expected."
177
177
methanolisation,lifetime,2050,20,years,2017,"Danish Energy Agency, Technology Data for Renewable Fuels (04/2022), Data sheet “Methanol to Power”.",
178
178
methanolisation,FOM,2050,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.3.2.1.",
179
+
csp-tower,investment,2020,159.96,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
180
+
csp-tower,investment,2030,108.37,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
181
+
csp-tower,investment,2040,99.97,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
182
+
csp-tower,investment,2050,99.38,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
183
+
csp-tower,FOM,2020,1,%/year,1,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
184
+
csp-tower,FOM,2030,1.1,%/year,1.1,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
185
+
csp-tower,FOM,2040,1.3,%/year,1.3,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
186
+
csp-tower,FOM,2050,1.4,%/year,1.4,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
187
+
csp-tower,lifetime,2020,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
188
+
csp-tower,lifetime,2030,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
189
+
csp-tower,lifetime,2040,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
190
+
csp-tower,lifetime,2050,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
191
+
csp-tower TES,investment,2020,21.43,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
192
+
csp-tower TES,investment,2030,14.52,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
193
+
csp-tower TES,investment,2040,13.39,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
194
+
csp-tower TES,investment,2050,13.32,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
csp-tower power block,investment,2020,1120.57,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
204
+
csp-tower power block,investment,2030,759.17,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
205
+
csp-tower power block,investment,2040,700.34,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
206
+
csp-tower power block,investment,2050,696.20,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
207
+
csp-tower power block,FOM,2020,1,%/year,1,see solar-tower.,-
208
+
csp-tower power block,FOM,2030,1.1,%/year,1.1,see solar-tower.,-
209
+
csp-tower power block,FOM,2040,1.3,%/year,1.3,see solar-tower.,-
210
+
csp-tower power block,FOM,2050,1.4,%/year,1.4,see solar-tower.,-
211
+
csp-tower power block,lifetime,2020,30,years,2020,see solar-tower.,-
212
+
csp-tower power block,lifetime,2030,30,years,2020,see solar-tower.,-
213
+
csp-tower power block,lifetime,2040,30,years,2020,see solar-tower.,-
214
+
csp-tower power block,lifetime,2050,30,years,2020,see solar-tower.,-
Copy file name to clipboardExpand all lines: outputs/costs_2020.csv
+9Lines changed: 9 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278
278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279
279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280
280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281
+
csp-tower,FOM,1.0,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282
+
csp-tower,investment,144.88,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283
+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284
+
csp-tower TES,FOM,1.0,%/year,see solar-tower.,
285
+
csp-tower TES,investment,19.41,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
csp-tower power block,FOM,1.0,%/year,see solar-tower.,
288
+
csp-tower power block,investment,1014.93,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289
+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281
290
decentral CHP,FOM,3.0,%/year,HP,from old pypsa cost assumptions
282
291
decentral CHP,discount rate,0.04,per unit,Palzer thesis,from old pypsa cost assumptions
283
292
decentral CHP,investment,1400.0,EUR/kWel,HP,from old pypsa cost assumptions
Copy file name to clipboardExpand all lines: outputs/costs_2025.csv
+9Lines changed: 9 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278
278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279
279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280
280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281
+
csp-tower,FOM,1.05,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282
+
csp-tower,investment,121.52,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283
+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284
+
csp-tower TES,FOM,1.05,%/year,see solar-tower.,
285
+
csp-tower TES,investment,16.28,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
csp-tower power block,FOM,1.05,%/year,see solar-tower.,
288
+
csp-tower power block,investment,851.27,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289
+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281
290
decentral CHP,FOM,3.0,%/year,HP,from old pypsa cost assumptions
282
291
decentral CHP,discount rate,0.04,per unit,Palzer thesis,from old pypsa cost assumptions
283
292
decentral CHP,investment,1400.0,EUR/kWel,HP,from old pypsa cost assumptions
Copy file name to clipboardExpand all lines: outputs/costs_2030.csv
+9Lines changed: 9 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278
278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279
279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280
280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281
+
csp-tower,FOM,1.1,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282
+
csp-tower,investment,98.15,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283
+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284
+
csp-tower TES,FOM,1.1,%/year,see solar-tower.,
285
+
csp-tower TES,investment,13.15,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
csp-tower power block,FOM,1.1,%/year,see solar-tower.,
288
+
csp-tower power block,investment,687.6,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289
+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281
290
decentral CHP,FOM,3.0,%/year,HP,from old pypsa cost assumptions
282
291
decentral CHP,discount rate,0.04,per unit,Palzer thesis,from old pypsa cost assumptions
283
292
decentral CHP,investment,1400.0,EUR/kWel,HP,from old pypsa cost assumptions
Copy file name to clipboardExpand all lines: outputs/costs_2035.csv
+9Lines changed: 9 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278
278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279
279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280
280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281
+
csp-tower,FOM,1.2,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282
+
csp-tower,investment,94.35,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283
+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284
+
csp-tower TES,FOM,1.2,%/year,see solar-tower.,
285
+
csp-tower TES,investment,12.64,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
csp-tower power block,FOM,1.2,%/year,see solar-tower.,
288
+
csp-tower power block,investment,660.96,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289
+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281
290
decentral CHP,FOM,3.0,%/year,HP,from old pypsa cost assumptions
282
291
decentral CHP,discount rate,0.04,per unit,Palzer thesis,from old pypsa cost assumptions
283
292
decentral CHP,investment,1400.0,EUR/kWel,HP,from old pypsa cost assumptions
Copy file name to clipboardExpand all lines: outputs/costs_2040.csv
+9Lines changed: 9 additions & 0 deletions
Original file line number
Diff line number
Diff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278
278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279
279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280
280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281
+
csp-tower,FOM,1.3,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282
+
csp-tower,investment,90.55,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283
+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284
+
csp-tower TES,FOM,1.3,%/year,see solar-tower.,
285
+
csp-tower TES,investment,12.13,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
csp-tower power block,FOM,1.3,%/year,see solar-tower.,
288
+
csp-tower power block,investment,634.32,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289
+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281
290
decentral CHP,FOM,3.0,%/year,HP,from old pypsa cost assumptions
282
291
decentral CHP,discount rate,0.04,per unit,Palzer thesis,from old pypsa cost assumptions
283
292
decentral CHP,investment,1400.0,EUR/kWel,HP,from old pypsa cost assumptions