Merge pull request #52 from euronion/csp-tower
Add cost assumptions for CSP (solar tower) incl. TES and power block
2 parents 8b929e0 + 63d0312 commit 5a10981

File tree

8 files changed

+100
-1
lines changed

8 files changed

+100
-1
lines changed

inputs/manual_input.csv

Lines changed: 37 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -13,7 +13,7 @@ H2 (g) pipeline,investment,2020,250.04,EUR/MW/km,2020,"European Hydrogen Backbon
1313
H2 (g) pipeline,lifetime,2020,50,years,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
1414
H2 (g) pipeline,FOM,2020,4,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
1515
H2 (g) pipeline,FOM,2050,1.5,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.","Assumption for a 140 bar, > 6000 MW_HHV single line pipeline, incl. booster station investments. Considering LHV by scaling with LHV/HHV=0.8462623413."
16-
H2 (g) pipeline repurposed,investment,2020,116.90,EUR/MW/km,2020,"European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.","Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 500 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
16+
H2 (g) pipeline repurposed,investment,2020,116.9,EUR/MW/km,2020,European Hydrogen Backbone Report (June 2021): https://gasforclimate2050.eu/wp-content/uploads/2021/06/EHB_Analysing-the-future-demand-supply-and-transport-of-hydrogen_June-2021.pdf.,"Assumption for 48-inch single line pipeline, incl. compressor investments, 16.9 GW peak capacity, 500 EUR/m, 434 MWe/1000 km for compressor, 3.4 MEUR/MWe for compressor, from European Hydrogen Backbone Report, Table 35."
1717
H2 (g) pipeline repurposed,lifetime,2020,50,years,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
1818
H2 (g) pipeline repurposed,FOM,2020,4,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
1919
H2 (g) pipeline repurposed,FOM,2050,1.5,%/year,2015,"Danish Energy Agency, Technology Data for Energy Transport (2021), Excel datasheet: H2 140.",Same as for new H2 (g) pipeline.
@@ -176,3 +176,39 @@ methanolisation,FOM,2030,3,%/year,2017,"Agora Energiewende (2018): The Future Co
176176
methanolisation,investment,2050,500000,EUR/MW_MeOH,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), table 8: “Reference scenario”.","Well developed technology, no significant learning expected."
177177
methanolisation,lifetime,2050,20,years,2017,"Danish Energy Agency, Technology Data for Renewable Fuels (04/2022), Data sheet “Methanol to Power”.",
178178
methanolisation,FOM,2050,3,%/year,2017,"Agora Energiewende (2018): The Future Cost of Electricity-Based Synthetic Fuels (https://www.agora-energiewende.de/en/publications/the-future-cost-of-electricity-based-synthetic-fuels-1/), section 6.3.2.1.",
179+
csp-tower,investment,2020,159.96,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
180+
csp-tower,investment,2030,108.37,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
181+
csp-tower,investment,2040,99.97,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
182+
csp-tower,investment,2050,99.38,"EUR/kW_th,dp",2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include solar field and solar tower as well as EPC cost for the default installation size (104 MWe plant). Total costs (223,708,924 USD) are divided by active area (heliostat reflective area, 1,269,054 m2) and multiplied by design point DNI (0.95 kW/m2) to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
183+
csp-tower,FOM,2020,1,%/year,1,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
184+
csp-tower,FOM,2030,1.1,%/year,1.1,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
185+
csp-tower,FOM,2040,1.3,%/year,1.3,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
186+
csp-tower,FOM,2050,1.4,%/year,1.4,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),Ratio between CAPEX and FOM from ATB database for “moderate” scenario.
187+
csp-tower,lifetime,2020,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
188+
csp-tower,lifetime,2030,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
189+
csp-tower,lifetime,2040,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
190+
csp-tower,lifetime,2050,30,years,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),-
191+
csp-tower TES,investment,2020,21.43,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
192+
csp-tower TES,investment,2030,14.52,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
193+
csp-tower TES,investment,2040,13.39,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
194+
csp-tower TES,investment,2050,13.32,EUR/kWh_th,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the TES incl. EPC cost for the default installation size (104 MWe plant, 2.791 MW_th TES). Total costs (69390776.7 USD) are divided by TES size to obtain EUR/kW_th. Exchange rate: 1.16 USD to 1 EUR."
195+
csp-tower TES,FOM,2020,1.00,%/year,1,see solar-tower.,-
196+
csp-tower TES,FOM,2030,1.10,%/year,1.1,see solar-tower.,-
197+
csp-tower TES,FOM,2040,1.30,%/year,1.3,see solar-tower.,-
198+
csp-tower TES,FOM,2050,1.40,%/year,1.4,see solar-tower.,-
199+
csp-tower TES,lifetime,2020,30.00,years,2020,see solar-tower.,-
200+
csp-tower TES,lifetime,2030,30.00,years,2020,see solar-tower.,-
201+
csp-tower TES,lifetime,2040,30.00,years,2020,see solar-tower.,-
202+
csp-tower TES,lifetime,2050,30.00,years,2020,see solar-tower.,-
203+
csp-tower power block,investment,2020,1120.57,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
204+
csp-tower power block,investment,2030,759.17,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
205+
csp-tower power block,investment,2040,700.34,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
206+
csp-tower power block,investment,2050,696.20,EUR/kW_e,2020,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,"Based on NREL’s SAM (v2021.12.2) numbers for a CSP power plant, 2020 numbers. CAPEX degression (=learning) taken from ATB database (“moderate”) scenario. Costs include the power cycle incl. BOP and EPC cost for the default installation size (104 MWe plant). Total costs (135185685.5 USD) are divided by power block nameplate capacity size to obtain EUR/kW_e. Exchange rate: 1.16 USD to 1 EUR."
207+
csp-tower power block,FOM,2020,1,%/year,1,see solar-tower.,-
208+
csp-tower power block,FOM,2030,1.1,%/year,1.1,see solar-tower.,-
209+
csp-tower power block,FOM,2040,1.3,%/year,1.3,see solar-tower.,-
210+
csp-tower power block,FOM,2050,1.4,%/year,1.4,see solar-tower.,-
211+
csp-tower power block,lifetime,2020,30,years,2020,see solar-tower.,-
212+
csp-tower power block,lifetime,2030,30,years,2020,see solar-tower.,-
213+
csp-tower power block,lifetime,2040,30,years,2020,see solar-tower.,-
214+
csp-tower power block,lifetime,2050,30,years,2020,see solar-tower.,-

outputs/costs_2020.csv

Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281+
csp-tower,FOM,1.0,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282+
csp-tower,investment,144.88,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284+
csp-tower TES,FOM,1.0,%/year,see solar-tower.,
285+
csp-tower TES,investment,19.41,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
286+
csp-tower TES,lifetime,30.0,years,see solar-tower.,
287+
csp-tower power block,FOM,1.0,%/year,see solar-tower.,
288+
csp-tower power block,investment,1014.93,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281290
decentral CHP,FOM,3.0,%/year,HP, from old pypsa cost assumptions
282291
decentral CHP,discount rate,0.04,per unit,Palzer thesis, from old pypsa cost assumptions
283292
decentral CHP,investment,1400.0,EUR/kWel,HP, from old pypsa cost assumptions

outputs/costs_2025.csv

Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281+
csp-tower,FOM,1.05,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282+
csp-tower,investment,121.52,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284+
csp-tower TES,FOM,1.05,%/year,see solar-tower.,
285+
csp-tower TES,investment,16.28,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
286+
csp-tower TES,lifetime,30.0,years,see solar-tower.,
287+
csp-tower power block,FOM,1.05,%/year,see solar-tower.,
288+
csp-tower power block,investment,851.27,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281290
decentral CHP,FOM,3.0,%/year,HP, from old pypsa cost assumptions
282291
decentral CHP,discount rate,0.04,per unit,Palzer thesis, from old pypsa cost assumptions
283292
decentral CHP,investment,1400.0,EUR/kWel,HP, from old pypsa cost assumptions

outputs/costs_2030.csv

Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281+
csp-tower,FOM,1.1,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282+
csp-tower,investment,98.15,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284+
csp-tower TES,FOM,1.1,%/year,see solar-tower.,
285+
csp-tower TES,investment,13.15,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
286+
csp-tower TES,lifetime,30.0,years,see solar-tower.,
287+
csp-tower power block,FOM,1.1,%/year,see solar-tower.,
288+
csp-tower power block,investment,687.6,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281290
decentral CHP,FOM,3.0,%/year,HP, from old pypsa cost assumptions
282291
decentral CHP,discount rate,0.04,per unit,Palzer thesis, from old pypsa cost assumptions
283292
decentral CHP,investment,1400.0,EUR/kWel,HP, from old pypsa cost assumptions

outputs/costs_2035.csv

Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281+
csp-tower,FOM,1.2,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282+
csp-tower,investment,94.35,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284+
csp-tower TES,FOM,1.2,%/year,see solar-tower.,
285+
csp-tower TES,investment,12.64,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
286+
csp-tower TES,lifetime,30.0,years,see solar-tower.,
287+
csp-tower power block,FOM,1.2,%/year,see solar-tower.,
288+
csp-tower power block,investment,660.96,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281290
decentral CHP,FOM,3.0,%/year,HP, from old pypsa cost assumptions
282291
decentral CHP,discount rate,0.04,per unit,Palzer thesis, from old pypsa cost assumptions
283292
decentral CHP,investment,1400.0,EUR/kWel,HP, from old pypsa cost assumptions

outputs/costs_2040.csv

Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -278,6 +278,15 @@ coal,efficiency,0.33,per unit,Lazard s Levelized Cost of Energy Analysis - Versi
278278
coal,fuel,8.15,EUR/MWh_th,BP 2019,
279279
coal,investment,3845.51,EUR/kW_e,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
280280
coal,lifetime,40.0,years,Lazard s Levelized Cost of Energy Analysis - Version 13.0,
281+
csp-tower,FOM,1.3,%/year,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
282+
csp-tower,investment,90.55,"EUR/kW_th,dp",ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
283+
csp-tower,lifetime,30.0,years,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power),
284+
csp-tower TES,FOM,1.3,%/year,see solar-tower.,
285+
csp-tower TES,investment,12.13,EUR/kWh_th,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
286+
csp-tower TES,lifetime,30.0,years,see solar-tower.,
287+
csp-tower power block,FOM,1.3,%/year,see solar-tower.,
288+
csp-tower power block,investment,634.32,EUR/kW_e,ATB CSP data (https://atb.nrel.gov/electricity/2021/concentrating_solar_power) and NREL SAM v2021.12.2 (https://sam.nrel.gov/).,
289+
csp-tower power block,lifetime,30.0,years,see solar-tower.,
281290
decentral CHP,FOM,3.0,%/year,HP, from old pypsa cost assumptions
282291
decentral CHP,discount rate,0.04,per unit,Palzer thesis, from old pypsa cost assumptions
283292
decentral CHP,investment,1400.0,EUR/kWel,HP, from old pypsa cost assumptions